Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Luan Nguyen, E.I.T. <br />13. ROLE IN THIS CONTRACT <br />Structural Engineer <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />15 <br />b. WITH CURRENT FIRM <br />15 <br />15. FIRM NAME AND LOCATION (City and State) <br />Lakdas/Yohalem Engineering, Inc., Fort Lauderdale, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Master of Science in Structural Engineering <br />University of Florida, 2002 <br />Bachelor of Science in Civil Engineering <br />University of Florida, 2000 <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> (EIT certified by the Florida Board of Professional Engineers) 2000 <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />West Wind Community Park <br />City of Lauderhill, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2010 <br />CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Structural renovation and hurricane hardiness for the Park Community Center renovation and addition. Services included <br />threshold inspection services. Const. Cost: $4M Role: Structural Engineer <br />b. <br />(1) TITLE AND LOCATION (City and State) <br /> McNab Bridge <br /> Pompano Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2003 <br />CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Condition Survey, Restoration and Expansion of 5 span, 4 lane bridge with sidewalks. Girder bridge with a continuous cast in <br />place and pre-stressed concrete pile foundation. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Hallandale High School Re-Roofing <br />Hallandale Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2014 <br />CONSTRUCTION (If applicable) <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Condition survey, structural analysis, structural design and roof design. Const. Cost: $100K Role: Structural Engineer <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Young Circle Amphitheater <br /> Hollywood, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2009 <br />CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Design of new amphitheater structural system. A $3 million dollar project developed in conjunction with the City of Hollywood. <br />Role: Structural Engineer <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Miramar Water Treatment Plant Expansion <br />Miramar, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Services included structural site condition survey, structural analysis, design, construction phase services and special <br />inspections services for renovations and upgrades. Const. Cost: $500K Role: Structural Engineer <br />Page 28