My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakdas/Yohalem Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Lakdas/Yohalem Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:35:10 AM
Creation date
8/21/2020 11:34:29 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
REFERENCE CHECK SURVEY <br />RFQ #19-11-388 – CIVIL/GENERAL ENGINEERING, WATER/WASTEWATER TREATMENT <br />PLANT ENGINEERING, SURVEYING AND MAPPING, ARCHITECTURAL DESIGN, AND GEO- <br />TECHNICAL SERVICES <br />FIRM BEING SURVEYED: _________________________________________________________________ <br />COMPANY COMPLETING SURVEY: _________________________________________________________ <br />PERSON COMPLETING SURVEY: _________________________DATES OF SERVICE: _______________ <br />1. Describe the scope of work performed by this firm for your organization? Provide Project Name. <br />2. Rate each of the criteria below on a scale of 1 to 10, 10 being very satisfied and 1 being very <br />unsatisfied. Please rate each criterion to the best of your knowledge. If you do not have <br />sufficient knowledge of past performance in a particular area, leave it blank. <br />ITEM CRITERIA SCORE <br />1 Ability to manage cost and complete project within budget <br />2 Ability to maintain project schedule and complete project on time/early <br />3 Quality/Qualifications of workmanship <br />4 Professionalism of Firm <br />5 Firms cooperation and reliability <br />6 Ability to communicate <br />7 Ability to maintain proper and detailed documentation <br />8 Appropriate use of technology <br />9 Ability to offer solid recommendations <br />10 Overall Client Satisfaction <br />3. What problems, if any, were encountered with this firm during performance of the project, and <br />how were they resolved? <br />4. Would you re-hire this firm? <br />Yes: ___________No: __________ Maybe: ____________ <br />_______________________________________________________ <br />Signature of Evaluator Date <br />/DNGDV<RKDOHP(QJLQHHULQJ,QF <br />/<(KDVZRUNHGIRUVHYHUDORIRXUSURMHFWVDVDVWUXFWXUDOILUPXQGHURXU8WLOLWLHVDQG3DYHPHQW$JUHHPHQWZLWK.HLWKDQG <br />$VVRFLDWHV6SHFLILFDOO\WKH([LW5RDGZD\3URMHFW&URVVZDON6LJQDOL]DWLRQDQGWKH8SSHU/HYHO7HUPLQDO'ULYH3URMHFW <br />1RQH <br />; <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />_________________________________________________________________________________ <br />SiSiSiSSiSSSSiSSSiSiSiSiSiSiSiSSSSSSSiSSSSiiiSiSSSSSiSSSSiiSiSSSSSiSSSSSSSSSSSSiSSSSSSSSiSSiSiSiiSSSiSSSiiSSiSiSSiiiiSSSSSiSSSSSiiSSiSSSSSSiiiSiSSSSSSSSiiSSSSSiiSSSSSiSiiiiSSSSSSSSSSiiiSSSSSSSSiSSSiiiSSSSSSSiSSSSSSSSiSiiSSSSSSSSSSSiSSSSSSSSSSiSSSiiSSSSiSSSSSSiSSSSSSSSSSSiiSSSSigngnggggngngggggnggggngnggggggnggngnngnnngnngngngnnngngggggggggnnngnnnnnnnngngggggggggggngggngnnnnnnnnnnnggggggggnnnnnnggggggggnnngnngggggggngggggnnngnnnnnngnggggngggnnnnnnnnggggggggnnnnnnnnngnggggggggnnnnnnggggnnnnnnnggggggggggnnnnnnnnggngnggggggnngnngngggnnngggggggggggnnnnnggggggggggnnnnnnngggngngggggggnnnnnnnnnggggggggggggggggggggggggggggggggggggggggggggggataataatatatataatataatataatataatattttttttataatataaatttttttaatattattttaaaaaaaatttataaaataataaaaattttaataaaaatttaaaaaaaaattaaaaaaaaaaaattattttaaaaaaaataaaaaattataaaaaatttttataaaaaattttttaaaaatttttttaaaaaaaaataattttttaaaaataaaaatttaaaaaaaaaatttttttaaaaaaatttttttaataaaaatatttttttuuuuuruuuuurururuuuuruurrrruruuuuuuuuururrrruuruuuuuuuurrrrruuuruuuuuuuruuuurrruuuuururruuuuuuuuuurrurrrruuuuruuuuuuurrruuuuuuuuuuuuuuuuurrrrruuurrrrrruurruuuurruuurrruuuuuuuure e eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee ofofoooofofofoffofoooffofoffofoffoofoffffofffofffofofffffoffffofffffoooooofofffffofoffooofffffoffoffoofffffoffffooffffffffoooffffffooffffffoofffffooofffoffooofffffffooffffofffooffffoffffoffff EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEvavavvvavavvvvavavvvvavvvvavaaaaaavaaaaaaavavvvvvavvvaaaaaaaavaaaavavavvvavvvvvvvvaaaaaaavaaaavvvvvvvvaaaaavavaaavvavvvvaaavaaaavavvvvvvaaaaaaavavaaavavvvaaaaaaavavaaavaaavvvvavavaaavaaaaaavvvvvvvvvaaaaavavaavvvvvvvvvaaaaaaaavvvvavvvvvvaaaaavaaavvavavvaaaaaavvvavvaaaavvvvvvvvvvvaaaaaaaavvvvvvvvvaaaaaaaaavvvvavavvavvaaaalulululullullllullululuulululluluululuululuullluulluulululluuluuuuuluuuuluullluluuuuuuulullululluuuuuuuullluuuuuuuuuuullluuuuuluuuuuuuuuuuuulluuuuuuuuuuuuullluuuuuuulluuuuuuuuuuuulllluuuluuuuuuullluuuluuuuuulluuuuuuullluuuuuuuuuuuataaaor <br />Broward County Aviation Department <br />Marsha L. Maldonado Rivera 2017-2019 <br />Page 39
The URL can be used to link to this page
Your browser does not support the video tag.