My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakdas/Yohalem Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Lakdas/Yohalem Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:35:10 AM
Creation date
8/21/2020 11:34:29 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Lakdas Nanayakkara, P.E. <br />Principal/Structural Engineer <br />Oakridge Elementary School, Hollywood, FL – engineer of record that included roof design, wind mitigation and <br />condition surveying, construction administration for a 180,000 SF re-roofing for existing school buildings 1-4. <br />Const. Cost: $40,000 <br />Tropical Research and Education Center (TREC) Laboratory Building Remodeling, Homestead, FL – structural <br />engineer of record for a laboratory addition and remodeling of existing laboratories at the University of Florida’s <br />Tropical Research and Education Center. Enlarged existing laboratory facilities and modernized interiors. Const. <br />Cost: $2.5M <br />Pine Ridge Education Center, Fort Lauderdale, FL - engineer of record for the design of a new educational center. <br />Services included inspections, planning, construction documents and assisted with permitting. Const. Cost: $12M <br />West Wind Community Park, City of Lauderhill, FL – engineer of record for structural renovations and hurricane <br />hardness for the Park Communication Center renovation and addition. Services included threshold inspection <br />services. Construction Cost: $4M <br />Deerfield Beach Pier, Deerfield Beach, FL – engineer of record for the restoration/replacement of 70’0 existing <br />wood pier and boat ramp. Construction Cost: $600,000. <br />Young Circle Amphitheater, Hollywood, FL – engineer of record for New Amphitheater venue, located at Young <br />Circle which included the design of structural system housing the new amphitheater, as well as, threshold <br />inspections. Const. Cost: $3M <br />Linear Park Pavilions 1, 4, 6, 8 & 11, Davie, FL – engineer of record to construction new docs for pavilions located <br />at each Park Pavilion. Services included detailed construction documents for electrical and plumbing systems only <br />with specifications and coordination with regulatory agencies and building departments for permit, as well as <br />construction administration services. <br />Gateway Park Renovation, Lauderhill, FL – engineer of record for the replacement of an existing pedestrian bridge <br />as well as replacement of irrigation pump and landscape features. Structural engineering design and construction <br />inspection services. <br />Radius Garage (over 20 Buildings and Parking Garages), City of Fort Lauderdale, FL – structural engineer of record <br />for structural condition survey and load rating analysis, analyzed and designed construction documents for the <br />renovation and phased construction engineering inspections and certification. <br />McNab Bridge, Pompano Beach, FL – engineer of record including condition survey, restoration, and expansion of <br />a 5 spam, 4 lane bridge. Girder bridge with continuous coast in place and pre-stressed concrete pile foundation. <br />Const. Cost: $1.2M <br />Sherman Street Seawall, City of Hollywood, FL – engineer of record for the design of both aluminum and concrete <br />seawalls. A restoration project with a construction cost of $455,000. <br />National and State Awards: <br />•Tamarac City Complex: National Award: Structural Engineer of Record <br />•Aventura City Complex: State Award: Structural Engineer of Record <br />•Tamarac Pedestrian Bridge: State Award: Structural Engineer of Record <br />•2011 National Tilt-Up Achievement Award – Tilt-Up Concrete Association <br />Page 43
The URL can be used to link to this page
Your browser does not support the video tag.