Laserfiche WebLink
Bandula Nanayakkara, Ph.D. <br />Senior/Special Inspector <br />Linear Park Pavilions 1, 4, 6, 8 & 11, Davie, FL – project included construction new docs for pavilions located at <br />each Park Pavilion. Services included detailed construction documents for electrical and plumbing systems only <br />with specifications and coordination with regulatory agencies and building departments for permit, as well as <br />construction administration services. <br />Young Circle Amphitheater, Hollywood, FL – Sr. inspector for New Amphitheater venue, located at Young Circle <br />which included the design of structural system housing the new amphitheater, as well as, threshold inspections. <br />Const. Cost: $3M <br />West Wind Community Park, City of Lauderhill, FL – Sr. inspector for structural renovations and hurricane <br />hardness for the Park Communication Center renovation and addition. Services included threshold inspection <br />services. Construction Cost: $4M <br />Deerfield Beach Pier, Deerfield Beach, FL – Sr. inspector for the restoration/replacement of 70’0 existing wood <br />pier and boat ramp. Construction Cost: $600,000. <br />Sherman Street Seawall, City of Hollywood, FL – project included the design of both aluminum and concrete <br />seawalls. A restoration project with a construction cost of $455,000. <br />Radius Garage (over 20 Buildings and Parking Garages), City of Fort Lauderdale, FL – Sr. inspector for structural <br />condition survey and load rating analysis, analyzed and designed construction documents for the renovation and <br />phased construction engineering inspections and certification. <br />Gateway Park Renovation, Lauderhill, FL – Sr. inspector for the replacement of an existing pedestrian bridge as <br />well as replacement of irrigation pump and landscape features. Structural engineering design and construction <br />inspection services. <br />McNab Bridge, Pompano Beach, FL – services including condition survey, restoration, and expansion of a 5 spam, <br />4 lane bridge. Girder bridge with continuous coast in place and pre-stressed concrete pile foundation. Const. Cost: <br />$1.2M <br />Bahia Mar Pedestrian Bridge, City of Fort Lauderdale, FL – Sr. inspector provided CEI services and final certification <br />for the pedestrian bring that included structural condition survey and Loan Rating analysis. <br />Page 45