Laserfiche WebLink
G.KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS <br />26.NAMES OF KEY 27.ROLE IN THIS 28. EXAMPLE PROJECTS <br />PERSONNEL CONTRACT (Fill in "Example Projects Key" section below before completing table. Place <br />(From Section E, (From Section E, "X" under pro·ect ke number for artici ation in same or similar role.) <br />Block 12) Block 13) ,. : . I <br />Stephen C. Smith, P.E. Cont ract Director / X X X X X X X X X X <br />Project Manager <br />Orlando A. Rubio, P.E. Project Mana ger / X X X X X <br />Sr. Supervising <br />Engineer <br />Frank Vilar, P.E. Sr. Supervising X <br />Engineer <br />Greg Giarratana Sr. Super vising X X X <br />Engineer <br />Al Caruso, E.I. Project Engineer X X X X <br />Keith Schriner Project Engineer X X <br />Robert Keener, PSM Project Surveyor X X X X X X X X X X <br />James Driscoll Director of SUE X X X X X X X <br />Alan Lopez Locates Supervisor X <br />Tony Gomes Sr. Field Rep X X X X X X X <br />William Tanto Sr. Field Rep X X X X <br />Michael Marenco CADD Manager X X X X X X X X X X <br />29.EXAMPLE PROJECTS KEY <br />NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) <br />City of Sunny Isles Beach Town of Pembroke Park <br />1 NE 174th Street Stormwater and Pavement 6 Sanitary Sewer Pump Station and <br />Improvements Forcemain Improvements <br />Town of Golden Beach City of Moore Haven <br />2 Capital Improvements Project Phase Ill & IV 7 Avenue R Stormwater Improvements <br />Stormwater Collection System with Master <br />Pump Stations <br />City of Miami Beach City of Sweetwater <br />3 Palm & Hibiscus Island Stormwater & 8 Stormwater & Pump Stati on <br />Roadway Improvements Improvements Phase IV <br />Hardee County Wauchula Hills Town of Pembroke Park <br />4 Water and Sanitary Sewer Improvements Ph 9 SW 52 nd Avenue (North) Roadway and <br />IV Drai nage Improvements <br />5 City of Margate 10 City of Pompano Beach <br />Lift Station No. 22 Rehabili tation SW 2 nd Street Drainage Improvements