My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Associates
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craig A. Smith & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:39:59 AM
Creation date
8/21/2020 11:38:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, If not specified. <br />C S Ffi h . . .20. EXAMPLE PROJECT KEY <br />NUMBER <br />I <br />21 TI TL E AND LOCATION (C11y and SI Jlc) 22 YEAR COMP LETED <br />Cit) of\\ t:,t Palm [k.ich Ckm<tl h Strt:ch,apc lmp rm crnrnts PRO FESSIONA L SERVICES CONSTRUCTION (,f Appl icable) \\ ..:,t l'.!1111 lk ,1eh. rlorid,1 <br />a. PROJECT OWNER <br />City of West Palm Beach <br />2019 201') <br />23.PROJECT OWNER'S INFORMATION <br />b. POINT OF CONT ACT NAME <br />Tinu Pena <br />c.POINT OF CONTACT TELEPHONE NUMBER <br />561-494-1051 <br />24. BRIEF DESCRI PTION OF PROJECT AND RELEVANCE TO THIS CONTRACT {Include scope, size, and cost) <br />Designed the electrical systems, including new decorative lighting poles and fixtures, along Clematis Street in the I 00 and <br />200 Blocks from Flagler Drive to Olive Avenue. The electrical systems included a new electrical service and power <br />distribution for photoelectric controlled street lights, power pedestals and receptacles. Calculations for the roadway <br />illumination were made in accordance with city requirements, and light pole details prepared for the selected decorative <br />lighting. <br />Total Project Cost = $16,400,000 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(1) FI RM NAME (2) FIRM LOCATION(C,1yandS1a1c) (3) ROLE <br />a. Smi th En gineer ing C(,nsultant,, \\'est Palm 13cach, 1'1(1rida Llcctrical Engin,:cring <br />Inc. <br />(1)FIRM NAME (2)FIRM LOCATION (City and State} (3) ROLE <br />b. <br />STANDARD FORM 330 (6/2004) PAGE 3.1
The URL can be used to link to this page
Your browser does not support the video tag.