Laserfiche WebLink
� Craig A. Smith & Associates, Inc. <br />SECTION E4 -WORKLOAD <br />& STAFF AVAILABILITY Engineers • Surveyors • Subsurface Utility Engineering <br />30 Subsurface Imaging• Utility Coordination <br />District Flow Diversion Weir <br />Indian Trait Improvement 140th Avenue North Roadway <br />District Improvements 100% 0% <br />Indian Trait Improvement Acreage Community Park Expansion South 100% 65% District -Phase I <br />Spring Lake Improvement Design & Build New WWTP 100% District <br />Sunshine Water Control West Outfall Canal Widening 100% District <br />Sunshine Water Control Coral Springs Drive Bridge Canal Widening 100% District <br />Town of Pembroke Park Meekins Lake Stormwater Analysis 100% <br />Town of Pembroke Park SW 25th Street Stormwater Improvements 100% Phase I <br />Sun-N-Lake Improvement WTP Process Instrumentation and Controls 100% District (Sebring) Uoi!rades <br />CURRENT MUNICIPAL CLIENTS (MULTI-YEAR CONTRACTS) <br />City of Belle Glade (Since 2013) Hardee County (Since 1999) <br />City of Lauderhill (Since 2013) City of Margate (Since 1988) <br />City of Moore Haven (Since 1995) City of Sunny Isles Beach (Since 2013) <br />City of Sweetwater (Since 2000) Glades County (Since 1993) <br />Indian Trail Improvement District (2003-2007, 2014 to Date) <br />5% <br />N/A <br />0% <br />0% <br />0% <br />0% <br />CCPWA Utility Authority (Since 1994) Spring Lake Improvement District (Since 2001) <br />Town of Golden Beach (Since 2000) Town of Pembroke Park (Since 1.987) <br />Village of Biscayne Park (Since 2013) Village of El Portal (Since 2003) <br />Sunshine Water Control District (Since 2015) City of Pompano Beach (Since 201.5) <br />Sun "N" Lake Water Control District (Since 2017) City of Lake Worth (Since 2018) <br />TEAM'S COMMITMENT & STAFF AVAILABILITY <br />For the requirements of this contract, the CAS Management Team will assign responsibilities to survey <br />crews, utility locating crews, staff engineers, subconsultants, construction management and supporting <br />staff as needed for each assigned project. All staff members involved with an assigned project will be <br />provided with the proper equipment and tools to perform the assign work. CAS is con fident that it <br />maintains adequate staff and staff availability to perform the work assigned and is able to increase <br />21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110