My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Associates
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craig A. Smith & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:39:59 AM
Creation date
8/21/2020 11:38:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION E1 -QUALIFICATION <br />� Craig A. Smith & Associates, Inc. <br />Engineers • Surveyors • Subsurface Utility Engineering <br />3D Subsurface Imaging • Utility Coordination <br />INFORMATION AND ASSIGNED <br />PERSONNEL· <br />City of Doral <br />City of Belle Glade <br />Beeline Community Development District <br />Town of Lantana <br />City of Palm Beach Gardens <br />City of Sunrise <br />City of Fort Lauderdale <br />City of Miami Beach <br />Lake Worth Drainage District <br />Florida Department of Transportation <br />South Florida Water Management District <br />Below is a sample list of successfully completed water, wastewater and stormwater related projects: <br />Palm Beach County <br />WTP No. 8 Wellfield Cable Replacement <br />WTP No. 8 UPS Installation <br />CROC Generator to SCADA Connection <br />PS 5229 Arc Flash & Condition Assessment <br />PS's 9S, 9N, & 5 Arc Flash & Condition Assessment <br />PS's 4i00, 5241, & Mecca Arc Flash & Condition Assessment <br />SRWRF Biogas Generators <br />Pahokee WWTP Arc Flash & Condition Assessment <br />Belle Glade WWTP Arc Flash & Condition Assessment <br />WTP No. 8 Arc Flash & Condition Assessment <br />SRWRF PLC Programming <br />Belle Glade WWTP PLC Programming <br />2016 Telemetry Information Management System (TIMS) Lift Station Upgrades, Design and <br />Construction Phase Services <br />2017 Telemetry Information Management System (TIMS) Improvements, Design and Construction <br />Phase Services <br />WUD Electrical Safety Plan <br />SRWRF PLC Programming <br />SRWRF Electrical Master Plan <br />Belle Glade and Pahokee WWTP Electrical Switchgear Assessment <br />Morikami SCADA Tower Design and Construction Phase Services <br />Miscellaneous Services (Morikami Park Pump Station, Other smaller projects) <br />City of West Palm Beach <br />Lift Station No. 5 Electrical Service Relocation <br />Lift Station No. 75 Improvements <br />Lift Station No. 4, 7, and 153 Improvements <br />Lift Station No. 74 Improvements <br />Lift Station No. 44 Improvements <br />Renaissance Project Stormwater Treatment and Pump Station <br />Water Treatment Plant Generator Replacement <br />Town of Jupiter <br />R.O Well No. i2 Acid Spill Report <br />21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
The URL can be used to link to this page
Your browser does not support the video tag.