Laserfiche WebLink
f.(1) TITLE AND LOCATION (City and State)(2} YEAR COMPLETED <br />General Subsurface Utility Services PROFESSIONAL CONSTRUC TION (if <br />City of Cooper City, Florida SERVICES aoolicable) <br />2008-2019 N/A <br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm <br />Continuing contract for utility locating services for the County's service area on an as-needed basis. <br />g.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />Bal Harbour Village PROFESSIONAL CONSTRUCTION (if <br />Bal Harbour Village, Florida SERVICES aoolicable) <br />2014 2016 <br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm <br />Various survey mapping and utility locates for construction projects for the expansion and/or rehabilitation of <br />utilities (pipelines and wastewater lift stations), acting as the Village Engineers, projects include Collins Avenue <br />(SR A1A) from 73 rd Street to 96th Street and 96 th Street to the Haulover cut (approximately 3 miles) and <br />rehabilitation of Lift Station No. 1 and installation of Lift Station No. 3. Also included is ongoing surveying and <br />utility locates as needed and a major route survey for the rehabilitation of the Village utility system and roadways <br />(approximately 3 miles lineally). <br />h.(1) TITLE AND LOCATION (City and State)(2} YEAR COMPLETED <br />AECOM/DRAGADOS PROFESSIONAL CONSTRUCTION (if <br />Fort Lauderdale, Florida SERVICES aoolicable) <br />2010 NIA <br />(3) BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm <br />Specific purpose survey and subsurface utility engineering services enhanced with 3D Radar Tomography in <br />advance of construction activities. Performed over 1 M square feet of 3D, RT, GPR, EM locating and 750 vacuum <br />excavation soft digs to assist in identifying potential conflicts between existing subsurface systems and numerous <br />proposed bridge column and sign foundations. <br />i.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />Regional Water Reclamation Facility PROFESSIONAL CONSTRUCTION (if <br />West Palm Beach, Florida SERVICES applicable) <br />2019 N/A <br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm <br />CAS performed Subsurface Utility Engineering services as a subconsultant to Hazen & Sawyer, Inc. for the City of <br />West Palm Beach East Central Regional Water Reclamation Facility. The scope of work included survey to <br />establish horizontal control, benchmarks and locating all pertinent above ground visible improvements and utilities <br />within the project area. Utility surface designation and mapping was performed utilizing 2D Ground Penetrating <br />Ra dar, 3D Radar Tomography scanning and calibration soft digs for approximately 260,000 ft2 of the facility to <br />identify types, sizes and locations of buried utilities. Deliverables included full electronic files containing CAD, <br />survey data and imagery collected and scanning performed for this project. All files were compatible with the Civil <br />3D CADD platform. Total project cost was $36,330. <br />j. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />Seminole Pratt-Whitney Road/Northlake Water and Force PROFESSIONAL CONSTRUCTION (if <br />Main Improvements SERVICES aoolicable) <br />Palm Beach County, Florida 2019 N/A <br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm <br />CAS performed subsurface utility engineering as a subconsultant to Chen Moore & Associates, Inc. for the Palm <br />Beach County Water Utilities Department. The scope of work included soft digs at forty (40) designated locations <br />to verify depths, sizes and materials of conflicting buried utilities for the design of a water main replacement along <br />Seminole Pratt-Whitney Road between Orange Boulevard and 88th Street. Total project cost was $24,875.