My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Avirom & Associates, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Avirom & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:52:22 AM
Creation date
8/21/2020 11:50:27 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIRM REFERENCES AND SIMILAR WORK COMPLETEDF <br />A.Client Name, Address, Contact, Phone and Email Address <br />City of Boca Raton/Burkhardt Construction <br />Tony Sabatino, Project Manager <br />561.659.1400 <br />tony@burkhardtconstruction.com <br />B.Project Title: <br />Boca Raton Downtown Promenade <br />C.Description of Work Performed: The main goal of this project was to create a pedestrian safe environment that connected <br />all parts of the City of Boca Raton downtown area, while providing appropriate accommodations of vehicular movement. <br />This project encompassed approximately 4,900 linear feet of Palmetto Park Road and three neighboring streets between <br />Federal Highway and the Intracoastal Waterway. Avirom & Associates, Inc. was contracted in 2009 to prepare the <br />topographic and tree survey for engineering design. Preparation of the base survey included recovery, research and <br />location of sufficient ground control to graphically delineate right-of-way lines, platted lot lines, property lines and <br />easement lines; coordination with the City of Boca Raton and utility companies to locate and depict underground <br />utilities; and establishment of an onsite benchmark network for construction. Our firm was then contracted by Burkhardt <br />Construction, Inc. to provide land surveying services for all phases of construction for this beautification project. <br />D.Year Completed: 2015 <br />Key Personnel: Michael D. Avirom, John T. Doogan and William Evans <br />A.Client Name, Address, Contact, Phone and Email Address <br />Monroe County <br />Steven Sanders Project Manager <br />(305) 295-4338 <br />Sanders-Steven@MonroeCounty-Fl.gov <br />B.Project Title: <br />Harry Harris Park <br />Tavernier Key, Florida <br />C.Description of Work Performed: Avirom & Associates, Inc. provided a boundary survey and Mean High Water Line <br /> survey at the site of the Harry Harris Park located at 50 East Beach Road, Tavernier Key, Monroe County, Florida. <br />D.Year Completed: 2018 <br />Key Personnel: Keith Brien and William Evans <br />A. Client Name, Address, Contact, Phone and Email Address <br />City of Fort Lauderdale/EDSA <br />Paul Kissinger, ASLA, Project Manager <br />954.524.3330 <br />pkissinger@edsaplan.com <br />B.Project Title: <br />Las Olas Riverwalk <br />Fort Lauderdale, Florida
The URL can be used to link to this page
Your browser does not support the video tag.