My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Master Consulting Engineers, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Master Consulting Engineers, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:55:35 AM
Creation date
8/21/2020 11:55:04 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 37 <br />Section F <br />Master Consulting Engineers, Inc. <br />Extreme Engineering | Incredible Results <br />PROFESSIONAL SUMMARY <br />As President of MCE, Armando has designed and successfully overseen <br />many technically challenging projects. His diverse knowledge of state- <br />of-the-art computer applications enables MCE to increase its service <br />capabilities and creates a progressive impact in the engineering industry. <br />Highly results and client service oriented, he focuses on timely and <br />satisfactory completion of projects and providing creative solutions to the <br />many challenges projects can often have. <br />PROJECT EXPERIENCE <br />Island Drive Bridge Rehabilitation Assessment | Delray Beach, Florida <br />Role: Principal in Charge | Type: Forensic Engineering | Size: 2,240 SF <br />| Construction Cost: +/-$9,299,310 <br />Banyan Seawall Repairs | Delray Beach, Florida <br />Role: Principal in Charge | Type: Study/Inspection | Size: 2,400 SF <br />| Construction Cost: +/-$507,500 <br />Atlantic Dunes Park Seawall & Parking Restoration | Delray Beach, Florida <br />Role: Principal in Charge | Type: Retaining Walls-Sheet Piles/ Renovation <br />| Size: Unknown | Construction Cost: +/-$23,551,045 <br />Treasure Island Additions and Renovation | Treasure Island, Florida <br />Role: Project Manager | Type: Addition/Renovation | Size: 5,000 SF <br />| Construction Cost: +/-$406,000 <br />St Pete Pier Dock | St. Petersburg, Florida <br />Role: Principle in Charge | Type: Renovation | Size: 2,000 SF <br />| Construction Cost: +/-$580,580 <br />Tarpon Springs Sponge Seawall | Tarpon Springs, Florida <br />Role: Project Manager | Type: Renovations | Size: Unknown <br />| Construction Cost: +/-$1,200,000 <br />Regional Water Reclamation Facility Admin Building | Tampa, Florida <br />Role: Principal in Charge | Type: New Construction | Size: 14,000 SF <br />| Construction Cost: +/-$5,000,000 <br />David L. Tippin Water Treatment Facility Master Plan | Tampa, Florida <br />Role: Project Manager | Type: Study/ Renovation | Size: Varies <br />| Construction Cost: +/-$5,472,880 <br />Port St. Lucie Lime Softening Water Treatment | Port St. Lucie, Florida <br />Role: Principal in Charge | Type: Forensic Engineering | Size: Unknown <br />| Construction Cost: +/-$568,400 <br />Armando Castellon, PE <br />Principal in Charge <br />ACADEMIC BACKGROUND <br />Master of Science in Civil <br />& Structural Engineering <br />University of Miami <br />Bachelor of Science in Mechanical <br />Engineering, <br />Universidad Metropolitana in <br />Caracas, Venezuela <br />REGISTRATIONS <br />Florida PE: 43453 <br />Florida Threshold Inspector: 0931 <br />Ohio PE: 66344 <br />North Carolina PE: 030704 <br />Kentucky PE: 24096 <br />SECB: 1078-0705 <br />NCEES: 32319 <br />YEARS OF EXPERIENCE <br />38 years total experience in <br />structural design. <br />20 years with MCE.
The URL can be used to link to this page
Your browser does not support the video tag.