Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Ignacio Serralta, PE <br />13. ROLE IN THIS CONTRACT <br />Civil Engineer <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />31 <br />b. WITH CURRENT FIRM <br />24 <br />15. FIRM NAME AND LOCATION (City and State) <br />SRS Engineering, Inc., Miami, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />BS Civil Engineering, California State University <br />Los Angeles, CA - 1988 <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />1991 / Civil Engineer / California C47828 <br />1992 / Civil Engineer / Florida PE45609 <br />Uniform Building Code Inspector <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Continuing Services Contract – City of South Miami <br />Task Order: City of South Miami Police Fueling Station Improvements <br />South Miami, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2013 <br />CONSTRUCTION (If applicable) <br />2015 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project consisted of site investigations, preliminary engineering design and preparation of conceptual site plans, final desi gn, <br />and preparation of construction documents, permitting and construction phase services for improvements to the exiting Police <br />Fueling Station located at the City Hall Complex. Renovations encompassed a new prefab metal canopy, lighting and camera <br />on canopy, new concrete access drive along the south side of the existing fuel pump, new hose bib, electrical outlet connection, <br />vacuum system, air compressor and storage cabinet at the service island. $32,630 Role: Civil Engineer or <br />Record <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Continuing Services Contract – City of Miami <br />Task Order: B-50904 – NW 7th Street Road Drainage Improvements <br />between NW 9th Court and NW North River Drive, City of Miami, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) ANDSPECIFIC ROLE Check if project performed with current firm <br />Drainage improvements to address area resident concerns of street flooding and standing water caused by recent severe <br />storms or high tides. Roadway and drainage improvements including reconstruction of the existing roadway and sidewalks, <br />installation of an outfall that drains into the Seybold Canal, curbs and gutter upgrades, replacing drainage components with <br />larger sized diameter pipes, raising the back of sidewalks, harmonizing with adjacent area to restrict sheet flow of rain water <br />into private property, regarding, milling and resurfacing, permitting with government agencies such as USACE, FDEP, RER and <br />City of Miami. Services provided along NW 7th Street Road between NW 9th Court and NW North River drive. $95,438 Role: Civil <br />Engineer of Record <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Miami-Dade County Pump Station Upgrades <br />Miami-Dade County, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2008 <br />CONSTRUCTION (If applicable) <br />2012 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />SRS provided engineering design and preparation of construction documents (Plans and Specifications) for the construction of <br />upgrades to existing Pump Stations. Upgrades included new pumping units, new electrical control panels, new electrical <br />services, new telemetry systems, replacement of PS piping, new valve vaults and fittings, new wet wells, demolition of existing <br />pump stations, and associated site improvements. Services also included plans processing and permitting; and bid phase <br />services. SRS also provided limited construction support services including attending construction meetings, respond to RFI’s, <br />review shop drawings, review and approval to change order requests, attend PS Start Up Inspection. Upgrades were provided <br />to Pump Station Nos. 7, 64, 140, 427, 430, 502, 767 and 1018. $530,087 Role: Civil Engineer of Record <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Ponce de Leon Boulevard Construction Engineering Inspection <br />Services, Coral Gables, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2010 <br />CONSTRUCTION (If applicable) <br />2012 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Construction administration support and inspection services during the construction of Ponce de Leon Boulevard Median <br />Beautification project as required by the Department to meet FDOT’s LAP Program requirements. $194,663 Construction Costs: <br />$1,816,772 Role: Civil Engineer of Record <br />20