E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Ignacio Serralta, PE
<br />13. ROLE IN THIS CONTRACT
<br />Civil Engineer
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />31
<br />b. WITH CURRENT FIRM
<br />24
<br />15. FIRM NAME AND LOCATION (City and State)
<br />SRS Engineering, Inc., Miami, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />BS Civil Engineering, California State University
<br />Los Angeles, CA - 1988
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />1991 / Civil Engineer / California C47828
<br />1992 / Civil Engineer / Florida PE45609
<br />Uniform Building Code Inspector
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Continuing Services Contract – City of South Miami
<br />Task Order: City of South Miami Police Fueling Station Improvements
<br />South Miami, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2013
<br />CONSTRUCTION (If applicable)
<br />2015
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project consisted of site investigations, preliminary engineering design and preparation of conceptual site plans, final desi gn,
<br />and preparation of construction documents, permitting and construction phase services for improvements to the exiting Police
<br />Fueling Station located at the City Hall Complex. Renovations encompassed a new prefab metal canopy, lighting and camera
<br />on canopy, new concrete access drive along the south side of the existing fuel pump, new hose bib, electrical outlet connection,
<br />vacuum system, air compressor and storage cabinet at the service island. $32,630 Role: Civil Engineer or
<br />Record
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Continuing Services Contract – City of Miami
<br />Task Order: B-50904 – NW 7th Street Road Drainage Improvements
<br />between NW 9th Court and NW North River Drive, City of Miami, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) ANDSPECIFIC ROLE Check if project performed with current firm
<br />Drainage improvements to address area resident concerns of street flooding and standing water caused by recent severe
<br />storms or high tides. Roadway and drainage improvements including reconstruction of the existing roadway and sidewalks,
<br />installation of an outfall that drains into the Seybold Canal, curbs and gutter upgrades, replacing drainage components with
<br />larger sized diameter pipes, raising the back of sidewalks, harmonizing with adjacent area to restrict sheet flow of rain water
<br />into private property, regarding, milling and resurfacing, permitting with government agencies such as USACE, FDEP, RER and
<br />City of Miami. Services provided along NW 7th Street Road between NW 9th Court and NW North River drive. $95,438 Role: Civil
<br />Engineer of Record
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Miami-Dade County Pump Station Upgrades
<br />Miami-Dade County, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2008
<br />CONSTRUCTION (If applicable)
<br />2012
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />SRS provided engineering design and preparation of construction documents (Plans and Specifications) for the construction of
<br />upgrades to existing Pump Stations. Upgrades included new pumping units, new electrical control panels, new electrical
<br />services, new telemetry systems, replacement of PS piping, new valve vaults and fittings, new wet wells, demolition of existing
<br />pump stations, and associated site improvements. Services also included plans processing and permitting; and bid phase
<br />services. SRS also provided limited construction support services including attending construction meetings, respond to RFI’s,
<br />review shop drawings, review and approval to change order requests, attend PS Start Up Inspection. Upgrades were provided
<br />to Pump Station Nos. 7, 64, 140, 427, 430, 502, 767 and 1018. $530,087 Role: Civil Engineer of Record
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Ponce de Leon Boulevard Construction Engineering Inspection
<br />Services, Coral Gables, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2010
<br />CONSTRUCTION (If applicable)
<br />2012
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Construction administration support and inspection services during the construction of Ponce de Leon Boulevard Median
<br />Beautification project as required by the Department to meet FDOT’s LAP Program requirements. $194,663 Construction Costs:
<br />$1,816,772 Role: Civil Engineer of Record
<br />20
|