My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chen Moore and Associates (cma)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Chen Moore and Associates (cma)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 12:05:05 PM
Creation date
8/21/2020 12:02:49 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS <br />26. NAMES OF KEY <br />PERSONNEL <br />(FROM SECTION E, BLOCK 12) <br />27. ROLE IN THIS <br />CONTRACT <br />(FROM SECTION E, BLOCK <br />13) <br />28. EXAMPLE PROJECTS LISTED IN SECTION F <br />(FILL IN “EXAMPLE PROJECTS KEY” SECTION BELOW BEFORE COMPLETING <br />TABLE. PLACE “X” UNDER PROJECT KEY NUMBER FOR PARTICIPATION IN SAME <br />OR SIMILAR ROLE.) <br />1 2 3 4 5 6 7 8 9 10 <br />Armando Castellon, PE Principal in Charge X X X X X X <br />Miguel Villegas, PE Project Manager X X X X <br />Carolyn- Vega Gonzalez, EIT Project Engineer X X X <br />#TITLE OF EXAMPLE PROJECT (From Section F)#TITLE OF EXAMPLE PROJECT (From Section F) <br />1.City of Pembroke Pines Waster Water 6.City of Tampa David L. Tippin Water Treatment Facility <br />2.Boca Delray Guard House 7.Golden Beach Town Center <br />3. Atlantic Dunes Park Seawall 8. <br />4.St. Petersburg Pier Dock Renovation and Reroofing 9. <br />5. Banyan Seawall Repairs 10.
The URL can be used to link to this page
Your browser does not support the video tag.