Laserfiche WebLink
Standard Form 330 (REV. 8/2016) Page 4 <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key Person) <br />E. <br />(1) TITLE AND LOCATION (CITY AND STATE)(2) YEAR COMPLETED <br />HELEN MILLER COMMUNITY CENTER <br />Opa-Locka, FL <br />PROFESSIONAL SERVICES <br />2012 <br />CONSTRUCTION (IF APPLICABLE) <br />2013 <br />(3) BRIEF DESCRIPTION (BRIEF SCOPE, SIZE, COST, ETC) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br />The design features the Moorish architecture unique to the City of Opa-Locka. The building contains <br />a community hall, meeting rooms, and administrative offices, and will also double as an emergency <br />shelter for the community. The construction used solid concrete tilt-wall construction with uniquely <br />shaped impact windows, form liners, and vivid colors that reflect the Moorish architectural style. <br />Hammond & Associates, Inc. provided Mechanical, Electrical, Plumbing, & Fire Protection. Role: <br />Electrical Engineer <br />D. <br />(1) TITLE AND LOCATION (CITY AND STATE)(2) YEAR COMPLETED <br />FORT LAUDERDALE FIRE STATION NO. 54 <br />Broward County, FL <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (IF APPLICABLE) <br />2018 <br />(3) BRIEF DESCRIPTION (BRIEF SCOPE, SIZE, COST, ETC) AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br />This 10,000 SF facility includes a two-bay apparatus room for a ladder and rescue trucks, a medical exam/watch <br />office, two business offices, equipment bunker storage, medical storage, decontamination room and a multi- <br />purpose room for department or community use complete with restroom facilities. The site also includes a <br />training tower for live drills. Living amenities within the two-story building include private dormitory facilities, <br />full-service kitchen with commercial range and hood, dining facility, day room with reclining theater seats, <br />covered exterior patio, laundry, and fitness facility. Sustainable building design and construction practices were <br />planned into the building and site design to attain Florida Green Building Coalition Certification. Role: Electrical <br />Engineer