Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, If not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT <br />KEY NUMBER <br /> <br /> 3 <br />21. TITLE AND LOCATION (City and State) <br />Miami Beach Sunset Islands 3 & 4 ROW Improvement Program <br />Miami Beach, FL <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If applicable) <br />2019 <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />City of Miami Beach <br />b. POINT OF CONTACT NAME <br />Rene Castillo, Sr. <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(954) 426-1042 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />CMA provided civil engineering and landscape architecture for the utility <br />infrastructure and roadway reconstruction of this multi award-winning <br />project consisting of two islands (Sunset Islands 3 and 4) off the Miami <br />Beach west coast, along the inter-coastal waterway. The project was <br />publicly bid as a design-build and funded by the City of Miami Beach. It <br />required coordination with various agencies including the City of Miami <br />Beach, the Miami-Dade Water and Sewer Department (M-D WASD), the <br />Miami-Dade Public Works Department, Army Corps. Of Engineers <br />(ACOE), the Miami-Dade Regulatory and Economic Resources <br />Department (RER) and others. Sunset Islands 3&4 was awarded project <br />of the year by the Cuban-American Association of Cuban Engineers <br />(CAACE) and was awarded the Project of the Year award by the <br />American Society of Civil Engineers (ASCE) at the ASCE Florida Section <br />Annual Conference on July 13, 2018. A presentation of the technical <br />components and lessons learned from this project was presented at the <br />conference as well as at the December 2017 Conference of the Florida <br />Stormwater Association (FSA). CMA served as the prime consultant for <br />civil engineering and Gregory Mendez, P.E., Branch Manager/Senior <br />Engineer served as project manager. <br /> <br />The project consists of complete roadway reconstruction and grading with new pavement section and curb; the replacement of 8" <br />potable water mains throughout; the lining of existing sanitary sewer mains; a completely new storm water drainage system, including <br />discharge pumps and outfalls; the undergrounding of all existing overhead utilities, new service connections to all properties; <br />landscaping; signage; and striping. <br /> <br />Client Information: <br />Ric-Man International <br />(Contact and phone above) <br />1545 NW 27th Avenue <br />Pompano Beach, FL 33069 <br />rcastillo@ric-man.us <br /> <br /> 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME <br /> Chen Moore and Associates <br />(2) FIRM LOCATION (City and State) <br /> Fort Lauderdale, FL <br />(3) ROLE <br /> Prime <br />b. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />c. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />d. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />e. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />f. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br /> STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />