My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chen Moore and Associates (cma)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Chen Moore and Associates (cma)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 12:05:05 PM
Creation date
8/21/2020 12:02:49 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, If not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT <br />KEY NUMBER <br /> <br /> 5 <br />21. TITLE AND LOCATION (City and State) <br />Lake Sarah/Lake Adele Stormwater & Roadway Improvements <br />Miami Lakes, FL <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If applicable) <br />2019 <br /> <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />Town of Miami Lakes <br />b. POINT OF CONTACT NAME <br />Tony Lopez <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(305) 364-6100 , x1130 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />Chen Moore and Associates implemented drainage and pavement improvements. These improvements were identified on the most <br />recent Town of Miami Lakes Stormwater Master Plan. The drainage basins total approximately 20 acres of an existing residential <br />neighborhood near Lakes Sarah, Adele, Suzie and Hilda in southern Miami Lakes near Miami Lakeway South and Ludlam Road. <br /> <br />Services include utility coordination, schematic and final design phases, government permitting, bidding assistance, construction <br />administration and statements of work completion. The final design included approximately 2,060 LF of exfiltration trench, <br />approximately 3,750 LF of solid stormwater pipe, 54 inlets and 5 control structures which discharge via existing outfalls. <br /> <br /> <br />Client Information: <br />City of Wilton Manors <br />(Contact and phone above) <br />2020 Wilton Drive <br />Wilton Manors, FL 33305 <br />Lopezt@miamilakes-fl.gov <br /> <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME <br /> Chen Moore and Associates <br />(2) FIRM LOCATION (City and State) <br /> Miami, FL <br />(3) ROLE <br /> Prime <br />b. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />c. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />d. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />e. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />f. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br /> STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.