My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chen Moore and Associates (cma)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Chen Moore and Associates (cma)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 12:05:05 PM
Creation date
8/21/2020 12:02:49 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, If not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT <br />KEY NUMBER <br /> <br /> 8 <br />21. TITLE AND LOCATION (City and State) <br />Ft Lauderdale FM Rehab, HDD & Swageline (1-4) <br />Fort Lauderdale, FL <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br /> <br />CONSTRUCTION (If applicable) <br />2018 <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />City of Fort Lauderdale <br />b. POINT OF CONTACT NAME <br />Richard Crow <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />954-842-4771 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br /> <br />CMA was the prime consultant for the 30” Emergency Force Main <br />Rehabilitation project in the City of Fort Lauderdale. This innovative <br />design-build project, led by Murphy Pipeline Contractors (MPC), was <br />undertaken to provide both mainline force main replacement for aging <br />infrastructure and to provide additional redundancy in case of future <br />issues. <br /> <br />The contract was divided into four (4) phases within the City of Fort <br />Lauderdale. The nearly 20,000 linear feet of pipeline was rehabilitated <br />through a combination of swagelining, directional drilling, and <br />traditional open cut installation over these four phases. CMA provided <br />planning, design, permitting, and engineering services during <br />construction. Environmental compliance, subaqueous crossing, <br />public involvement, and maintenance of traffic in the busy Sistrunk <br />and Himmarshee Business Districts were some of the additional <br />project complexities. CMA also provided dewatering permitting and <br />groundwater modeling due to contaminated sites within quarter mile <br />of the projects. This project was awarded the 2019 Project of the <br />Year by the ASCE Broward Branch. <br /> <br />Client Information: <br />Murphy Pipeline Contractors Inc <br />(Contact and phone above) <br />5400 S University Drive, Suite 301 <br />Davie, FL 33328 <br />richardc@murphypipelines.com <br /> <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME <br /> Chen Moore and Associates <br />(2) FIRM LOCATION (City and State) <br /> Fort Lauderdale, FL <br />(3) ROLE <br /> Prime <br />b. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />c. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />d. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />e. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />f. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br /> STANDARD FORM 330 (REV. 8/2016) PAGE 3
The URL can be used to link to this page
Your browser does not support the video tag.