My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chen Moore and Associates (cma)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Chen Moore and Associates (cma)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 12:05:05 PM
Creation date
8/21/2020 12:02:49 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS <br />26. NAMES OF KEY <br />PERSONNEL <br />(From Section E, Block 12) <br />27. ROLE IN THIS <br />CONTRACT <br />(From Section E, Block 13) <br />28. EXAMPLE PROJECTS LISTED IN SECTION F <br />(Fill in “Example Projects Key” section below before completing table. <br />Place “X” under project key number for participation in same or similar role.) <br />1 2 3 4 5 6 7 8 9 10 <br />Jose Acosta, P.E., F.ASCE Principal in Charge <br /> <br />X X X X X X X X X <br />Gregory Mendez, P.E. Project Management <br /> <br />X X X X X X <br />Safiya Brea, P.E., LEED AP Field Inspection <br /> <br />X X X X <br />Brent Whitfield, P.E., ENV SP Engineering Design <br /> <br /> <br />Jennifer Smith, P.E. Cost Estimating and Permitting <br /> <br />X X X <br />Daniel Davila, P.E. Cost Estimating and Permitting <br /> <br />X X <br />Patrick Kaimrajh, P.E. Bidding <br /> <br />X X X X X X X <br />Nicholas Karpathy, E.I., ENV <br />SP <br /> Bidding <br /> <br /> X X X X X <br />Joel Brownsey, P.E. Field Inspection <br /> <br /> X <br />Michael Buick, P.E. Engineering Design <br /> <br /> X <br />Jose McCray <br /> <br />Construction Administration <br /> <br /> <br />X X X X X X <br />Manuel Caamano <br /> <br />Construction Administration <br /> <br /> <br />X X <br />Carlos Tijeino <br /> <br />Construction Administration <br /> <br />X X <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />29. EXAMPLE PROJECTS KEY <br />NO. TITLE OF EXAMPLE PROJECT (From Section F) NO. TITLE OF EXAMPLE PROJECT (From Section F) <br />1 Broward County UAZ 110/111 & 113 Water Sewer <br />Improvements 113B (RFP No. R1356803P1) 6 Wilton Drive Water Main Replacement <br />2 NMB-Highland Drive Roundabout 7 NMB-NE 180th Dr- Roundabout <br />3 Miami Beach Sunset Islands 3 & 4 ROW Improvement <br />Program 8 Ft Lauderdale FM Rehab, HDD & Swageline (1-4) <br />4 Park Dr 16 inch Water Main Replacement 9 Merrick Manor Sanitary Sewer Ph I <br />5 Lake Sarah/Lake Adele Stormwater & Roadway <br />Improvements 10 NW 19th St 8" Water Main Replacement - Client No. <br />E15-WASD-03A <br />STANDARD FORM 330 (REV. 8/2016) PAGE 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.