|
STANDARD FORM 330 (REV. 8/2016) PAGE 1
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />12. NAME
<br />Daniel Gonzalez M., PE
<br />13. ROLE IN THIS CONTRACT
<br />Geotechnical Engineer/Project Manager
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />5
<br />b. WITH CURRENT FIRM
<br />4
<br />15. FIRM NAME AND LOCATION (City and State) Professional Service Industries, Inc., Miami, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />MS in Geotechnical Engineering, Florida Atlantic University, Boca Raton, FL, 2016
<br />BS in Civil Engineering, Magna Cum Laude, Florida Atlantic University, Boca Raton, FL, 2015
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE
<br />AND DISCIPLINE)
<br />Professional Engineer FL 88370, 2019
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />SR A1A/Dania Beach Blvd. Shoulder Widening, Roadway Soils Survey
<br />Broward County, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (if applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />The project consists of roadway and shoulder widening as well as construction of a concrete sidewalk along State Road
<br />A1A/Dania Beach Boulevard from Ocean Drive (MP: 5.42) to Gulfstream Road (MP: 6.691) in Broward County, Florida. The
<br />proposed project consists of approximately three feet of shoulder widening on the westbound of the subject roadway
<br />segment. The construction of a 4-foot wide concrete sidewalk is proposed along the eastbound side. Two to four feet of
<br />roadway widening will take place along the median separating both sides of the subject roadway segment. The sidewalk along
<br />the west side will remain in place. Furthermore, the proposed project will include milling and resurfacing of the roadway
<br />asphalt pavement. PSI previously performed asphalt pavement cores along the subject roadway segment. PSI performed a
<br />geotechnical engineering study and provided the associated report. Role: Staff Engineer - Lab testing, Drafting, assist in writing
<br />Report | Client: FDOT District 4 Materials Office | Contact: Matthew Gisondi, PE | matthew.gisondi@dot.state.fl.us | 954-677-
<br />7038 | Financial Project ID: 437847-1-52-01 | T.W.O. NO.: 76 | CONTRACT NO. C9L13 | PSI Fees: $12,487 | Start Date:
<br />02/01/2018 | PSI Project: 0397-1315
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Golden Glades Interchange
<br />Miami-Dade County, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (if applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Located at the Golden Glades Interchange in Miami-Dade County, Florida, the project(s) consisted of improvements to SR-826
<br />at the Golden Glades Interchange including a new bridge, associated retaining MSE walls and high embankments, pavement
<br />milling and resurfacing, and drainage improvements. PSI provided: Geotechnical Field Exploration, Laboratory Testing, and
<br />Engineering Services. Role: Staff Engineer | Client: CSA Group, 8200 NW 41st St, Suite 305, Doral, FL | Contact(s): Roberto M.
<br />León, Senior Vice President | Mr. Javier E. Ramos, Senior Transportation Manager/Project Manager | jeramos@csagroup.com
<br />| 305-461-5484 | Dates: 03/2017-04/2018 | Construction Start Date: 09/2020 - Construction Completion Date: TBD | PSI
<br />Fees: $39,299 | Total Value of Project: $388 million (all related projects)
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />I-95 Express Lanes 3C Tender Phase Geo
<br />Broward County, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017
<br />CONSTRUCTION (if applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />The project limits extend along I-95 (SR 9) from south of Hollywood Boulevard to Broward Boulevard in Broward County from
<br />approximately 9 miles. The project also includes improvements along I-595 from SR 7 to I-95 for a distance of approximately 2
<br />miles, direct connection between northbound and southbound 95 Express Lanes and I-595 to and from the west, and the
<br />painting of 17 existing steel bridges the I-95/SR 84 and I-95/I-595 Interchanges. PSI is providing Geotechnical Investigation
<br />Analysis and Plan: Geotechnical Interpretative Report for I-95 Express Lanes – Phase 3C, 95 Express/I-595 Direct Connectors, I-
<br />95 from Stirling Road to Broward Boulevard. Role: Staff Engineer| Client: Ferrovial Agroman UP CORP | PSI Fees: $137,500 |
<br />Start Date: 08/08/2017 | PSI Project: 0397-1260
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Doral Academy Baseball Field Drainage Improvements
<br />Miami, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017
<br />CONSTRUCTION (if applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Performed three (3) percolation tests at a depth of approximately 3.5 feet below existing grade within the grassy area of the
<br />baseball field. A geotechnical engineer reviewed the soil samples recovered from the borings. The samples were visually
<br />classified per the Unified Soil Classification System (USCS) and the results of our work was summarized in a letter report of
<br />geotechnical services. Role: Project Manager | Client: FIELD TURF USA INC. | Contact: Mr. Fritz Ballard 843-450-2104 | PSI
<br />Services: Geotechnical | PSI Fees: $1,980 | Start Date: 04/18/2017 | PSI Project: 03971201
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />12-Story Residential Building
<br />Fort Lauderdale, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017
<br />CONSTRUCTION (if applicable)
<br />N/A
|