|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br />
<br />12. NAME
<br /> Juan S. Calderon, PE, PTOE
<br />13. ROLE IN THIS CONTRACT
<br /> Project Manager
<br />14. YEARS EXPERIENCE
<br />a. TOTAL 20 b. WITH CURRENT FIRM 9
<br />15. FIRM NAME AND LOCATION (City and State)
<br />CALTRAN Engineering Group, Inc. – 790 NW 107 Ave. Suite 200, Miami FL 33172
<br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) MS in Civil Engineering, Florida International University, Florida 1999 Professional Engineer in Florida No. 58569, 2002 BS in Civil Engineering; University Santo Tomas, Bogota, Colombia 1997 Professional Traffic Operations Engineer No. 1301, 2004 Professional Transportation Planner No. 20, 2007
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br /> Mr. Calderon has over 20 years of experience in traffic/ transportation engineering with a Master Degree in Civil Engineering. Mr. Calderon has been involved in managing multiple traffics and planning engineering projects with the FDOT and related contracts. Likewise, he has participated actively in preliminary engineering reports, design project and planning, development of alternatives, conceptual designs, corridor studies, simulation, and GIS.
<br />19. RELEVANT PROJECTS
<br />
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br /> Downtown Miami Streets (Lane Elimination) SW/ SE 1st Street
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2017-2018
<br />CONSTRUCTION (If applicable) N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Provided traffic engineering services as part of feasibility study to apply Complete Streets concepts; existing conditions analysis, traffic analysis for
<br />no build and build conditions, transit system operation analysis. Study recommended lane elimination and 1st bus preferential lane only in Miami-
<br />Dade County. Responsible for design to apply a Complete Streets concept; included provided signing & pavement marking plans including bike lane
<br />and bus preferential lane. Responsible for before-after study evaluation of Complete Streets concept; included survey, traffic and non-motorized data
<br />collection, safety evaluation, travel time for vehicular and transit. Contact: Patrice Smith/Neal Schafer (305)379-6566, schafers@miamidda.com.
<br />
<br />
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />
<br />City of Coral Gables Comprehensive Multimodal Transportation Plan
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016-2018
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Plan to develop 10-year blueprint to improve city's transportation system and address key mobility needs to provide better travel choices for
<br />residents, visitors, City employees. Conducted data collection and served as technical advisor for new traffic calming master plan. Contact: Atkins
<br />North America, Jack S. Schnettler, PE, (305) 514-3369, jack.schnettler@atkinsglobal.com
<br />
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br /> NW 17 Street Traffic Impact Analysis
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2016- 2018
<br />CONSTRUCTION (If applicable) N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm This project ensure a healthy traffic environment for the City of Sweetwater residents, visitors, and proposed businesses developments through the
<br />proposed public facilities and services typical sections at NW 17th Street between NW 111th Avenue/ NW 112th Avenue and NW 108th Avenue, as
<br />well as NW 110th Avenue, between NW 17th including committed developments assessment, provide a micro-simulation of existing and future
<br />conditions during AM and PM peak periods, concurrency analysis, turn lane evaluation, and determine recommendations to mitigate possible
<br />impacts. Contact: Alvarez Engineers Inc. Juan Alvarez, 305-640-1345.
<br />
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br /> Traffic Study of Miramar Parkway & Palm Avenue Modification
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2012-2013
<br />CONSTRUCTION (If applicable) N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Reviewed and supervised traffic data collection activities for preparation of traffic study that included turning movement counts for intersection.
<br />Included traffic signal design with roadway signing and pavement markings to implement modifications at intersection of Miramar Pkwy and Palm
<br />Ave. Contact: Bissy Bempala, 954-602-3323.
<br />
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br /> City of Oakland Park
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2017-Ongoing
<br />CONSTRUCTION (If applicable) N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Included Traffic Impact Reviews for private applications such new hospital, revision of traffic calming ordinance, re-development of traffic calming
<br />program, assistance with roadway design consulting to improve two roundabouts at NW 38th St with NW 3rd Ave and NW 5th Ave to determine
<br />geometric modifications to enhance traffic pattern deflections within inner travel lanes. Contact: Albert J. Carbon III, PE, 954-630-4257,
<br />albertc@oaklandparkfl.gov.
<br />
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />54
|