My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chen Moore and Associates (cma)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Chen Moore and Associates (cma)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 12:05:05 PM
Creation date
8/21/2020 12:02:49 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />55 <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br />4 <br />21. TITLE AND LOCATION (City and State) <br /> <br /> Doral K-8 Center <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />218-2019 <br />CONSTRUCTION (If applicable) <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER <br />Zyscovich Architects <br />b. POINT OF CONTACT NAME <br />Juan Socorro <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(305) 372-5222 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> Responsible for traffic impact study for new public school for 750 students. Included inventory of existing and proposed land use, operations and access, intersections and pedestrian facilities, traffic data collection, trip generation, trip distribution and traffic assignment, traffic analysis of future conditions, queuing analysis, parking facilities, drop-off/pick-up traffic operating plan, staffing; reports provided conclusions and on/off site recommendations. Coordinated with Miami-Dade County Public School District, City of Doral, Miami-Dade County Traffic Division. Total $ 8,800.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />a. <br />(1) FIRM NAME <br /> <br />CALTRAN Engineering Group, Inc. <br />(2) FIRM LOCATION (City and State) <br /> <br />Miami, Florida <br />(3) ROLE <br />Sub Consultant <br /> <br />b. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br /> <br />c. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br /> <br />d. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br /> <br />e. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br /> <br />f. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />
The URL can be used to link to this page
Your browser does not support the video tag.