My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BEA Architects, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
BEA Architects, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 10:51:29 AM
Creation date
8/21/2020 12:08:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
33 <br />Form SF330 Part I <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br />21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />23.PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />b. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />c. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />BEA Architects, Inc.Miami, FL Architect <br />10 <br />DDiissnneeyy CCrruuiissee TTeerrmmiinnaall 88,, PPoorrtt CCaannaavveerraall,, FFLL Ongoing <br />BEA Architects award-winning design for the state-of-the-art, Disney-themed cruise terminal, located in Port Canaveral, FL, provides passengers with the fully immersive Disney experience at the time of their arrival. The fourth-generation terminal includes advanced intermodal busing and luggage handling facilities, allowing passengers the ease of checking luggage once with the airline or hotel and routing it directly to their final destination. <br />In 2019, BEA was once again selected to renovate Port Canaveral’s Cruise Terminal 8 which includes the design of three new additions, adding approximately 27,115 SF to the existing building. The new additions will include a Disney-themed front plaza that features living green sculptures of Mickey and Minnie Mouse, Donald Duck, Goofy and Pluto, over a lush floral garden that surrounds an iconic sculpture of Steamboat Willie. The additions also include a covered entry canopy and two covered baggage sorting areas, with a 8,200-SF entry hall. Passengers’ arrival will be enhanced with a new extended additional 300-LF covered drop-off zone, a new 1,200-SF check-in area and a new concierge area. BEA is adding a new 7,800-SF baggage screening building. BEA has expanded the mail room to a total of 1,300-SF to make the communications at the port easier. Waiting areas will also be updated with modern water side restrooms and will feature a larger seating area that will include 1,000 seats to accommodate larger passenger flows. BEA has also worked with Jacobs Engineering Group Inc. for the coordination of a new gangway building integration, site and wharf lighting. The estimated project cost is $39.6 million. <br />Canaveral Port Authority Ms. Veronica Narvaez-Lugo (321) 783-7831 ext. 428
The URL can be used to link to this page
Your browser does not support the video tag.