Laserfiche WebLink
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br />12. NAME 13. ROLE IN THIS <br />CONTRACT 14. YEARS EXPERIENCE <br />Jannek Cederberg, PE Project Manager, <br />Senior Coastal <br />Engineer <br /> a. TOTAL <br />17 <br /> b. WITH CURRENT FIRM <br />10 <br />15. FIRM NAME AND LOCATION (City and State) <br />Cummins Cederberg, Inc. (South Miami, FL) <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />MSc Coastal Engineering, Technical University of <br />Denmark <br /> 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />PE 69839 (Florida, Professional Engineer) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Jannek is originally from Denmark and earned his master’s degree in coastal engineering from the Technical University of Denmark. Prior <br />to relocating to South Florida 17 years ago, he worked in Denmark for two large international consulting firms in their respective coastal <br />and marine engineering departments. During his graduate studies, he also spent time at the Danish Hydraulic Institute - now named DHI <br />Water & Environment. Jannek has completed engineering analyses and designs for a variety of shore protection, beach nourishment, <br />riverine, cruise-ship, marina and waterfront projects throughout South Florida. He has prepared construction plans and specifications for <br />shore protection works including beach nourishment, jetties, groins, revetments, breakwaters, and bulkheads. <br />19. RELEVANT PROJECTS <br />a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Matheson Hammock Park Sea Level Rise and Flood Mitigation Plan, <br />Coral Gables, FL <br /> PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />2018 NA <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager. Prepared a Sea Level Rise Flood Mitigation Plan to analyze the impacts of sea level rise on the park’s <br />infrastructure and operations, as well as develop flood mitigation concepts for planning and budgeting. Compiled existing <br />survey data within the Park and LiDAR data for the area to prepare a general topographic map for the Park; assessed the <br />condition of existing infrastructure to understand conditions, remaining s ervice life and adaption feasibility relative to sea <br />level rise; performed an assessment of the environmental conditions on site to generally understand and document <br />current conditions, as it would relate to environmental permitting; conducted an engineeri ng analysis to provide extreme <br />tide water levels; developed flood mitigation concepts and preliminary cost estimates; coordinated stakeholder <br />involvement; developed an implementation strategy; final report of findings and strategy. <br />b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Haulover Park Sea Level Rise and Flood Mitigation Analysis, <br />Miami Beach, FL <br />PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />2020 NA <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager. Prepared a Sea Level Rise Flood Mitigation Analysis to analyze the impacts of sea level rise on the <br />park’s infrastructure and operations, as well as develop flood mitigation concepts for planning and budgeting. Compiled <br />existing survey data within the Park and LiDAR data for the area to prepare a general topographic map for the Park; <br />assessed the condition of existing infrastructure to understand conditions, remaining service life and adaption feasibility <br />relative to sea level rise; performed an assessment of the environmental conditions on site to generally understand and <br />document current conditions, as it would relate to environmental permitting; conducted an engineering analysis to provide <br />extreme tide water levels; developed flood mitigation concepts and preliminary cost estimates; coordinated stakeholder <br />involvement; developed an implementation strategy; final report of findings and strategy. <br />c (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Miami Beach Truck Haul, <br />Miami Beach, FL <br />PROFESSIONAL <br />SERVICES <br />CONSTRUCTION (If applicable) <br />2015 NA <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager. Performed surveying, data collection, volumetric and equilibrium toe of fill analysis based on available <br />historical beach profiles for four segments of beach. This information was utilized in designing the expansion of beach <br />segments for maintenance nourishment. <br />d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> MSC Cruises Ocean Cay, <br />Bimini Islands, The Bahamas <br />PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />Ongoing NA