Laserfiche WebLink
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 5 <br /> <br /> <br />G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS <br />26. NAMES OF KEY <br />PERSONNEL <br />(From Section E, <br />Block 12) <br />27. ROLE IN THIS <br />CONTRACT <br />(From Section E, <br />Block 13) <br />28. EXAMPLE PROJECTS LISTED IN SECTION F <br />(Fill in “Examples Projects Key” section below before completing <br />table. Place “X” under project key number for <br />participation in same or similar role.) <br />1 2 3 4 5 6 7 8 9 10 <br />Jannek Cederberg, PE Project Manager X X X X X X <br />Jason Cummins, PE Senior Marine Engineer X X X X X <br />Jordon Cheifet, PE, CFM Senior Marine Engineer <br />Jason Taylor, PE Senior Marine Engineer X X X <br />Leonard Barrera, EI Coastal Engineer X X X X X X X <br />Sahar Haddadian, EI Coastal Engineer X <br />Colton Manning, EI Marine Engineer <br />Jon Cunningham, EI Marine Engineer X X X X <br />Ken Chang, EI Marine Engineer X <br />Danielle Irwin Regulatory Review & <br />Environmental Permitting X <br />Penny Cutt Environmental Science & <br />Permitting <br />Gina Chiello Environmental Science & <br />Permitting X X X X X X <br />Christie Hurley Environmental Science & <br />Permitting <br />Jessica Ward Environmental Science & <br />Permitting X <br />Anne Laird Environmental Science & <br />Permitting X <br />Rebecah Delp Environmental Science & <br />Permitting X X X X <br />Caroline Jasperse Environmental Science & <br />Permitting X <br />29. Example Projects Keys <br /> <br />NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) <br />1 Town of Bay Harbor Islands Seawall Condition <br />and Resiliency Assessment <br />6 <br />Biannual Seagrass Monitoring <br />2 Sunset Harbour Yacht Club Marina Repairs <br />and Replacement <br />7 Coastal Program Management Support <br />& Dune Restoration <br />3 <br />Colonial Club Condominium Seawall Repair <br />8 Black Point Marina Environmental Survey <br />and Permitting <br />4 <br />Coco Plum Beach Erosion Study and Design <br />9 <br />Jungle Island Shoreline Stabilization and Marina <br />5 Haulover Park Sea Level Rise and Flood <br />Mitigation Roadmap <br />10 <br />MSC Cruises Ocean Cay Private Destination Island <br />