Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Durvall Pedro <br />15. FIRM NAME AND LOCATION (City and State) <br />Osborn Engineering (Deerfield Beach, Florida) <br />13. ROLE IN THIS CONTRACT <br />Project Manager <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />25 1 <1 <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />Associates of Applied Science in HVAC Technology, Massasoit N/A <br />College, 1994 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />ASPE 1996 -Present, Associate Member, Miami Chapter <br />19. RELEVANT PROJECTS <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 - <br />RFQ 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES SECTION E - PAGE 24 <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (ifapplicable) <br />City of Sunny Isles Beach - Government Center Expansion <br />Sunny Isles Beach, Florida <br />2015 <br />1 N/A <br />a. <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if performed with current firm <br />A new facility that will be used for municipal educational and community & civic purposes, as well as retail/commercial space. The <br />project scope for this mixed-use building also included associated parking for the program. Size: 100,000 SF. <br />Cost: $63M estimated. Role: Lead Plumbing Design Engineer. <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (ifapplicable) <br />City of Sunny Isles Beach - Gateway Park Community Center Build -Out <br />Sunny Isles Beach, Florida <br />2017 <br />2020 estimated <br />b. <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE Check if performed with current firm <br />The Gateway Park renovations are intended to result in a Community Center. The indoor facility will include (but is not limited to) <br />office space, reception area, multi-purpose rooms to accommodate classes, meetings, banquets, and an indoor stage, catering <br />kitchen, arts & crafts space, restrooms and storage area. Size: 17,420 SF. Cost:$6 M. Role: Lead Plumbing Design Engineer. <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (ifapplicable) <br />Broward County - West Regional Courthouse <br />Plantation, Florida <br />2020 <br />2021 estimated <br />c. <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE ❑✓ Check if performed with current firm <br />Osborn provided MEP/FP services for the renovation of the courthouse including the Clerk of Court office, renovation of the <br />Passport & Marriage & Domestic Violence services, security check points and County Civil / Traffic & Misdemeanor areas. Size: <br />9,600 SF. Role: Lead Plumbing Design Engineer. <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (ifapplicable) <br />Broward County - Fleet Services No. 3 Office Renovations <br />Pompano Beach, Florida <br />2020 <br />2021 estimated <br />d. <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE F✓ Check if performed with currentfirm <br />Osborn provided MEP/FP services, including demolition of interior partitions, light fixtures, HVAC unit/ductwork, water fountain and <br />relocation of telecom board. New work included main office, lounge and kitchenette improvements to lighting, HVAC/ductwork, <br />replacement of windows, water heater, exhaust fan, and more. Description. Size: 2,200 SF. Role: Lead Plumbing Design Engineer. <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />1 <br />CONSTRUCTION (ifapplicable) <br />City of Doral - White Course Park <br />Doral, Florida <br />2020 <br />2021 estimated <br />e. <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE Z✓ Check if performed with current firm <br />Osborn provided MEP permit drawings and contract administration services for the design of electrical site and parking lot lighting, <br />as well as MEP design for one restroom building, power for the irrigation system, and empty conduit and power for a future security <br />system. Role: Lead Plumbing Design Engineer. <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 - <br />RFQ 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES SECTION E - PAGE 24 <br />