Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Igor F. Gonzalez, PE, LEED AP HVAC Support a. TOTAL b. WITH CURRENT FIRM <br />26 16 <br />15. FIRM NAME AND LOCATION (City and State) <br />ESI Consulting Engineers, Inc. (Doral, Florida) <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />Bachelor Degree in Mechanical Engineering, University of New Professional Engineer (Florida 56098 - Mechanical) <br />Orleans <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />LEED Accredited Professional; US Green Building Council; American Society of Heating, Refrigerating and Air Conditioning Engineers <br />(ASHRAE); National Fire Protection Association (NFPA); American Society of Plumbing Engineers (ASPE); Fluent in English and Spanish <br />19. RELEVANT PROJECTS <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />RFQ 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES SECTION E - PAGE 30 <br />(1) TITLE AND LOCATION (Cityand State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (ifapplicable) <br />City of Sunny Isles Beach - Government Center Expansion <br />Sunny Isles Beach, Florida <br />2016 <br />1 On Hold <br />a. <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE O✓ Check if performed with current firm <br />Design for the multi-purpose Annex Expansion to the City's Government Center. Size: 8 -story, ±183,000 SF. Underground Parking <br />+52,000 SF. ±49,000 SF middle school, ±29,000 SF Public Area/Theatre, ±21,000 SF Senior Activity Center, and a ±32,000 SF <br />Office Tower. Cost: $63M estimated. Role: Mechanical Engineer of Record/Principal-in-Charge. <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (ifapplicable) <br />City of Sunny Isles Beach - Gateway Park Community Center Build -Out <br />Sunny Isles Beach, Florida <br />2017 <br />2020 <br />b. <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE ❑✓ Check if performed with current firm <br />Interior build -out of the indoor facility including (but not limited to) office space, reception area, multi-purpose rooms to <br />accommodate fitness, classes, meetings, banquets, and an indoor stage, catering kitchen, restrooms and storage area. Size: <br />±17,500 SF. Cost:$6 M. Role: Mechanical Engineer of Record/Principal-in-Charge. <br />(1) TITLE AND LOCATION (Cityand State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (ifapplicable) <br />Jackson Health Systems - Jose Milton Memorial Hospital <br />Doral, Florida <br />2018 <br />2021 estimated <br />c. <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE ❑✓ Check if performed with current firm <br />The facility consists of a Diagnostic & Treatment Hospital with an Emergency Dept, Radiology, Surgical Suite, Sterile Processing <br />Dept, ICU, etc., a 60,000 SF Medical Office Building, and includes a 3 -story Parking Structure which houses the Central Energy <br />Plant. This new Hospital will be LEED Certified. Size: 100 -Bed Hospital, ±255,000 SF. Cost: $300 M. Role: Mechanical EOR/PIC <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SER=2020 <br />TRUCTION (ifapplicable) <br />Jackson Memorial Hospital - DTC Expansion Bed Tower <br />Miami, Florida <br />2019 <br />estimated <br />d. <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE F✓ Check if performed with current firm <br />Vertical expansion adding 3 levels of ICU beds including isolation rooms and pharmacy with clean room. New chilled water and <br />steam/hot water reheat services, new rooftop air handling units w/ integral enthalpy device and its air distribution system. LEED <br />Certified. Size: ±80,600 SF. Cost: $79M. Role: Mechanical Engineer of Record/Principal-in-Charge <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />1 <br />CONSTRUCTION (ifapplicable) <br />Broward Health North - Emergency Department and Surgical Suite Expansion <br />Deerfield Beach, Florida <br />2014 <br />2017 <br />e. <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE Z✓ Check if performed with current firm <br />2 -story Emergency Dept and Operating Suite expansion. Consists of 5 Nursing Modules comprising 53 exam rooms, 3 trauma <br />rooms and ancillary support spaces. The 2nd floor surgery suite consists of 6 class C operating rooms surrounding a shared sterile <br />core. Size: ±54,000 SF. Cost: $27M. Role: Mechanical Engineer of Record/Principal-in-Charge <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />RFQ 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES SECTION E - PAGE 30 <br />