My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Osborn Engineering
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Osborn Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 10:55:45 AM
Creation date
8/24/2020 10:53:20 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1-. t,&AMYLt VKUJtI: 10 VVH[t.;M Utb I ILLU, I KA I t f KUI'U,tU I tAM-b 20. EXAMPLE PROJECT KEY <br />QUALIFICATIONS FOR THIS CONTRACT NUMBER <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. 3 <br />Complete one Section F for each project.) <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />Broward County - Light Pole Installation PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) <br />2020 2021 estimated <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER b.POINT OF CONTACT NAME 1c. POINT OF CONTACT TELEPHONE NUMBER <br />Broward Countv Darren Badore, Thompson & Associates (954) 761-1073 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) f. �� <br />The project consisted of electrical engineering design to install 12 lights and cameras on <br />existing 55' tall light poles (with cameras) and 7 new light poles in 19 locations throughout <br />central Broward County. Powers to the poles were required for the lights and cameras. <br />• Code search for items applicable to electrical design <br />• Develop electrical basis of design narratives <br />• Identify rough space requirements for E equipment and pathways <br />• Conduct Project meetings <br />• Conduct site visits <br />• Finalize electrical calculations <br />• Finalize selections of major equipment <br />• Provide equipment cut sheets to Structural Engineer for coordination <br />with equipment weights and space requirements <br />• Provide construction document drawings and drawing specifications <br />for bidding and permit process <br />• Update backgrounds from Civil Engineer as required <br />• Provide set of signed and sealed drawings to City for permit <br />Size: 19 light pole modifications/installations <br />Cost: $1.4M <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />RFQ 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES SECTION E - PAGE 33 <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />a. <br />Osborn Engineering <br />Deerfield Beach, Florida <br />Electrical Engineering <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />b. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />C. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />d. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />e. <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3) ROLE <br />f. <br />STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />RFQ 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES SECTION E - PAGE 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.