|
Page 15
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />15. FIRM NAME AND LOCATION (City and State)
<br />CFM Architects Inc., Miami, Florida
<br />16. EDUCATION (DEGREEAND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATEAND DISCIPLINE)
<br />Bachelor of Arts: School of Architecture and Interior Design
<br />Florida International University -University Park, FL
<br />School of Architecture: Architecture
<br />University of Miami -Coral Gables, FL
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE El Check if project performed with current firm
<br />Design and Construction for mixed-use, three-story building with retail stores on the ground floor, surface parking and additional
<br />parking spaces at the upper floor, with access to second story offices. Total Compensation for Services: $ 45K Project Construction
<br />Cost: $3M, Role: Project Manager
<br />t �
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Florida International (FIU) Student Housing PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable)
<br />Miami, Florida 2016 2018
<br />a.
<br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE ® Check if project performed with current firm
<br />Design of a 246 student housing units. 15 story building with multi student amenities, including rooftop pool area, fitness & sports
<br />centers, & 400 car garage. Developer — DAYCO, Role: Project Manager
<br />(1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (Ifapplicable)
<br />Miami -Dade County EDP-AV-2014-A/E2-4: Architectural and Engineering
<br />Analysis, Design and Upgrades, Aviation Dept., Miami -Dade, Florida
<br />2015
<br />2018
<br />b.
<br />(3) BRIEF DESCRIPTION (Briefscope, size, cos[, etc.) AND SPECIFIC ROLE ® Check if project performed with current firm
<br />A continuing type contract with Miami -Dade County EDP "Equitable Distribution Program" Construction Cost: $200,000, Role:
<br />Project Manager
<br />(1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (Ifapplicable)
<br />Rita Gardens Medical Office Building
<br />Doral, Florida
<br />2013
<br />2015
<br />C.
<br />(3) BRIEF DESCRIPTION (Briefscope, size, cost etc.) AND SPECIFIC ROLE ® Check if project performed with current firm
<br />Design and Construction building with 70,000 square feet of rentable space suited for a complex medical service including Wellness
<br />Center, Cosmetic Surgery Clinic, MRI and other Imaging Services. Construction budget was set at $8,500,000 and the work was
<br />completed in 2015 on time and under budget. Role: Assisted with Project Management and Closeout
<br />(1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />Affordable housing with retail space
<br />Hallandale Beach, Florida
<br />2016
<br />2017
<br />d.
<br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE ® Check if project performed with current firm
<br />Design and Construction for mixed-use, three-story building with retail stores on the ground floor, surface parking. Construction
<br />Cost: $unknown, Role: Project Manager
<br />(1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />Rita Gardens Shopping Center
<br />Doral, Florida
<br />2015
<br />2017
<br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE El Check if project performed with current firm
<br />Design and Construction for mixed-use, three-story building with retail stores on the ground floor, surface parking and additional
<br />parking spaces at the upper floor, with access to second story offices. Total Compensation for Services: $ 45K Project Construction
<br />Cost: $3M, Role: Project Manager
<br />
|