My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CFM Architects, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
CFM Architects, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 11:02:33 AM
Creation date
8/24/2020 11:01:34 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21. TITLE AND LOCATION (City and State) <br />Rita Gardens Shopping Center, Doral Florida <br />a. PROJECT OWNER <br />Private Client <br />b. POINT OF CONTACT NAME <br />Developer: Alfredo Reviati <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />Page 17 <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br />2015 2017 <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(305) 316-5868 <br />areviati@gmail.com <br />Located at a 58,706 SF lot corner of major arteries in the City of Doral, this shopping center stands out due to its <br />gracious design and bold forms, identified with its function, driving attention from passers-by. <br />Cristina Fandino faced another challenging task to accommodate a mix -use, three-story building with retail stores on <br />the ground floor, surface parking and additional parking spaces at the upper floor, with access to second story offices, <br />this project is the perfect example of coordination of functions and adjacent accommodations so that retail <br />customers, office employees and visitors may have access to each destination, including complete cover and interior <br />elevators. Construction budget was set at $6,000,000 and the work was completed within two years of established <br />schedule and under budget. <br />Total Compensation for Services: $ 44K <br />Project Construction Cost: $3M <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />a. CFM Architects, Inc. I Miami, Florida I Architect <br />(1) FIRM NAME 1 (2) FIRM LOCATION (City and State) I (3) ROLE <br />b. <br />
The URL can be used to link to this page
Your browser does not support the video tag.