Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />Jorge A. Canales, P.E. <br />M. Haiiar&Associates, Inc <br />B.S. - Civil Engineering <br />B.S. - Architectural Engineering <br />National Highway Institute Certified Instructor <br />Civil Engineer <br />14. TrJ enrMLNUt <br />48 <br />Professional Registered Engineer PE # 60444 / FL <br />19. RELEVANT PROJECTS <br />STANDARD FORM 330 (REV. 7/2018) PAGE 2 <br />(1) TITLE AND LOCATION (Cftyand State) <br />(2) YEAR COMPLETED <br />South Miami K-8 Center, Miami FL. <br />PROFESSIONAL SERVICES CONSTRUCTION (Ifappocable) <br />2017 2018 <br />(3) BRIEF DESCRIPTION (Bdefscope, size, cost, etc.) AND SPECIFIC ROLE QCheck if project performed with current firm <br />a. <br />installation new drainage system. [Role: Project Manager] <br />Construction Cost: $229,000 <br />(1) TITLE AND LOCATION (City and Slate) <br />(2) YEAR COMPLETED <br />Miami- Edison SHS, Miami FL <br />PROFESSIONAL SERVICES CONSTRUCTION (Nappocable) <br />2017 2018 <br />(3) BRIEF DESCRIPTION (Bdefscope, size, cost, etc.) AND SPECIFIC ROLE Check If project performed with current firm <br />b <br />Removal of Pedestrian Truss Bridge and Approach Ramp Removal [Role:Prgect Manager] <br />Construction Cost: $150,000 <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Hialeah Gardens SHS, Miami FL <br />PROFESSIONAL SERVICES CONSTRUCTION (tlappocable) <br />2017 2018 <br />(3) BRIEF DESCRIPTION (Bdefscope, size, cost, etc.)AND SPECIFIC ROLE ©Check If project performed with current firm <br />C. <br />Removal and replacement of existing slope protection along the driveway to the student's parking lot, and the addition <br />of safety railings. [Role: Project Manager] Construction Cost: $50,000 <br />(1) TITLE AND LOCATION (City and State) <br />1 (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Napp4cable) <br />School Board Administration Building (SBAB) Complex, Miami FL <br />2016 <br />2018 <br />(3) BRIEF DESCRIPTION (adefscops, size, cost, eto.) AND SPECIFIC ROLE QCheck If project performed with current firm <br />d <br />Structural Repairs to SBAB and Garage Building [Rale: Project Manager] <br />Construction Cost: $102,000 <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION ffoppocabre) <br />Coral Terrace Elementary School <br />2015 <br />2017 <br />(3) BRIEF DESCRIPTION (edefscope, size, cost, eta) AND SPECIFIC ROLE Check If project performed with current firm <br />e. <br />Provide engineering services and construction administration for playground safely surface remodel, renovations and <br />other improvements. Construction Cost: $1,737,567 [Role: Project Manager] <br />STANDARD FORM 330 (REV. 7/2018) PAGE 2 <br />