|
12. NAME
<br />Eric J. Hammond, PE
<br />V. W u n LutlneN 1 NKM
<br />31
<br />15. FIRM NAME AND LOCATION (CITY AND STATE)
<br />HAMMOND &ASSOCIATES, INC., PLANTATION, FL I MIAMI, FL
<br />16. EDUCATION ( DEGREE AND SPECIALIZATION) 17, CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br />• BS MECHANICAL ENGINEERING -UNIVERSITY OF THE WEST INDIES PE FLORIDA -MECHANICAL
<br />1973 FLORIDA PE 39048
<br />• DIPLOMA ELECTRICAL ENGINEERING - UNIVERSITY OF
<br />TECHNOLOGY 1967
<br />I& OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.)
<br />National Fire Protection Association (N FPA)
<br />Florida Engineering Society
<br />19. RELEVANT PROJECTS
<br />Standard Form 330 (REV. 8/2o16) Page 1
<br />(1)TITLE AND LOCATION (CITY AND STATE)
<br />(2)YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (IF APPLICABLE)
<br />CITRUS GROVE ELEMENTARY SCHOOL, MIAMI, FL
<br />2017
<br />2019
<br />A..
<br />(3)BRIEF DESCRIPTION (BRIEF SCOPE, SIZE, COST, ETC)AND SPECIFIC ROLE X CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br />Citrus Grove Elementary School extended its facility approximately 16,500SF of General Classrooms, Student and Staff Restrooms, and
<br />Utility Spaces (Mechanical, Janitorial, and Electrical rooms). Hammond &Associates provided Mechanical, Plumbingand Fire Protection
<br />Engineering Design services for the project. Role: Mechanical I Principal
<br />(1)TITLE AND LOCATION (CITY AND STATE)
<br />(2)YEAR COMPLETED
<br />ETHEL KROGER BECKHAM ELEMENTARY SCHOOL-
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (IF APPLICABLE)
<br />MIAMI, FL
<br />2017
<br />I
<br />2019
<br />B
<br />(3) BRIEF DESCRIPTION (BRIEF SCOPE, SIZE, COST, ETC)AND SPECIFIC ROLE OCHECKIF PROJECT PERFORMED WITH CURRENT FIRM
<br />The scope of our work Included construction of a new 378 -student station, i -story classroom building comprising of 13
<br />classrooms,1 general science classroom, t science lab with associated storage spaces, l computer lab,1 foreign language
<br />lab, an administration area,1 multipurpose room with 2 student changing rooms, 2 student toilet rooms, 2 staff toilet
<br />rooms, attached dining shelter, covered walkway connections, new hard court, additional parking, landscaping, and
<br />drainage and Irrigation systems. Role: Mechanical I Principal
<br />(1) TITLE AND LOCATION (CITY AND STATE)
<br />(1) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (IF APPLICABLE)
<br />DRIFTWOOD MIDDLE SCHOOL, HOLLYWOOD, FL
<br />2018
<br />2020
<br />C•
<br />(3) BRIEF DESCRIPTION (BRIEF SCOPE, SIZE, COST, ETC)AND SPECIFIC ROLE nXCHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br />Provided HVAC and Plumbing design services for 11 existing buildings which Included replacement of Chiller, exhaust fans,
<br />exhaust hoods, and duct heaters. Role: Mechanical I Principal
<br />(1)TITLE AND LOCATION (CITY AND STATE)
<br />(2)YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (IF APPLICABLE)
<br />MIAMI SPRINGS MIDDLE, MIAMI, FL
<br />2o16
<br />2019
<br />D.
<br />(3) BRIEF DESCRIPTION (BRIEF SCOPE, SIZE, COST, ETC)AND SPECIFIC ROLE XCHECK IFPROJECT PERFORMED WITH CURRENT FIRM
<br />Elements of our design were the upgrades to selective HVAC system -wide replacement, including controls cooling tower,
<br />chiller and controls. Upgrades were made to the Fire Alarm and PA system. Construction cost: $3M. Role: Mechanical
<br />Principal
<br />Standard Form 330 (REV. 8/2o16) Page 1
<br />
|