Laserfiche WebLink
(I)TITLEAND LOCATION (CITY AND STATE) (2)YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (IF APPLICABLE) <br />NORLAND ELEMENTARY, MIAMI, FL 2009 2010 <br />(B) BRIEF DESCRIPTION (BRIEF SCOPE, SIZE, COST, ETC)AND SPECIFIC ROLE ❑K CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br />Redesigned the electrical system for the computer and communication rooms to accommodate additional students. <br />Construction administration was performed throughout project duration. Construction cost: $725 Thousand. Role: <br />Electrical Engineer <br />Standard Form 330 (REV. 8/2o16) Page 6 <br />