Laserfiche WebLink
STANDARD SECTION 35F55 <br />TIONS <br />NUMBER <br />PROJECT KEY <br />(Present as many projects as requested by the agency, or f0 projects, if not specified. 2 <br />Complete one Section F for each project. <br />21. TITLE AND LOCATION (Cityand Stated 22. MONTH&YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (I/eppficaWe) <br />Coral Terrace Elementary, 6801 SW 241h St, Miami FL 33155 2015 2017 <br />Miami -Dade County Public School <br />24. BRIEF DESCRIPTION OF PROJ <br />23. PROJECT OWNER'S INFORMATION <br />Marilyn Z. Capon <br />TO THIS CONTRACT (Include scope, size, <br />305-9954833 <br />Our firm has been the AIE for the school renovation. This includes Architectural, structural and Mechanical] Bedricall Plumbing planning and design. We have <br />designed as Following: <br />-Site: Playground lacks appropriate impact surface. Transportable building needs to be demolished. The exledor requires painting <br />-Building 1: The aluminum windows are damaged and require replacement. The acoustical ceiling files are damaged and require replacement Complete kitchen <br />HVAC installation for Non -Air -Conditioned facility. Domestic water piping requires replacement. The group restroom in infrastructure, fixture Ifinishes are beyond their <br />useful life. <br />-Building 2: The aluminum windows are damaged and require replacement. Complete HVAC system -wide replacement. The group restroom in infrastructure, fixture/ <br />finishes are beyond their useful life. New Storefronts and doors & door Frames . Including masonry. <br />-Building 3: The aluminum windows are damaged and require replacement. The steel windows are damagedand require replacement. Interior renovation of the entire <br />first floor (administration office). Complete HVAC system -wide replacement. <br />-Building 4: The aluminum windows are damaged and require replacement. The steel windows are damaged and require replacement. Complete HVAC systemwide <br />replacement. The group restroom in infrastructure, fixture t finishes are beyond their useful life. Replace existing mill -work Convert single balrooms to ADA bathrooms. <br />-Building 5: The suspended ceiling grid is damaged and require replacement (include new tiles).The group restroom in infrastructure, fixture I finishes are beyond their <br />useful life. 2x4' Interior fluorescent lighting is damaged and should be replaced. <br />-New administration office including new reception area, clinic, ADA bathroom and showers. <br />-Naw RA system. <br />Provide construction management and coordination , overseeing contractor, review and processing of payment requisitions, respond to RFPs, reviewing submittal and <br />shop drawings. Review and approve dose out documents and submit to Main! Dade County Public Schools. <br />Construction cost: $1,737,567.00 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />STANDARD FORM 330 (REV. 7.2018) PAGE 3 <br />(1) FIRM NAME <br />(2)FIRMLOCATION (Cityand Stele) <br />(3iROLE <br />a, <br />M. Hagar & Associates. Inc. <br />0 VAnda ks, coal Gebks R.331M <br />SNcba5lepinea"ng <br />(1)FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />p)ROLE <br />b. <br />(1) FIRM NAME <br />(2)FIRMLOCATION (Cityand State) <br />(3) ROLE <br />C. <br />(1)FIRM NAME <br />(2)FIRMLOCATION (Cityand State) <br />(3)ROLE <br />d. <br />(1)FIRM NAME <br />(2)FIRMLOCATION (Cityand State) <br />(3)ROLE <br />B. <br />(1) FIRM NAME <br />(2)FIRMLOCATION (Cityand State) <br />(3) ROLE <br />f. <br />STANDARD FORM 330 (REV. 7.2018) PAGE 3 <br />