My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
M. Hajjar & Associates,INC.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
M. Hajjar & Associates,INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 11:13:17 AM
Creation date
8/24/2020 11:09:51 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARD SECTION "F" <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20, EXAMPLE PROJECT KEY <br />QUALIFICATIONS FOR THIS CONTRACT NUMBER <br />(Present as many projects as requested by the agency, or 10 projects, if notspecifted. $ <br />Complete one Section F for each project.) <br />21. TITLE AND LOCATION (Cftyend State) 22. MONTH &YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (Ifepppcable) <br />Southside Elementary, 45 SW 13th St, Mlami FL 33130 2018 2019 <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT NAMEc. POINTOF CONTACT TELEPHONE NUMBER <br />Miami -Dade County Public School Juliette Hinsey Pinder (305)9951270 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, cost andphofos Awthe proiecr) <br />M. Hajjar & Associates won the NE for renovationtrehabilitation of a two story historic building at Southside Hementary School. The scope of work for this project was <br />as follows: <br />-Demolition of entire interior finishes of the building and expose the existing structure. Removal of all exteriordoors and windows. <br />-Reinforce the existing structure of the building and roof. <br />-New plumbing, New HVAC, and EMS control. New electrical: Conducts and wires and electrical panels. New low voltage, new security cameras, new IT, new fire <br />alarm system. <br />-Two new group restroom. Installed new floors and ceilings with new lighting. <br />-New classrooms. New impact doors and windows <br />-New roof <br />-Stucco repair & paint <br />Cost: $1,990,936.70 <br />Contingency Adjustment <br />-Added New Airhandter - $15,006.00 - Omer request <br />-Replace Termite 2'x12' wood joist - $3622.50 - Unfoiseen condition <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />STANDARD FORM 330 (RtV, f-21.118) PAGE 3 <br />(1)FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3)ROLE <br />a <br />M. HaGarBAssWales, Inu <br />45Vaa Avs,Caal G.IA%FL33134 <br />ad <br />kdih .&6MIsal Egk.aYp <br />(1)FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3)ROLE <br />b. <br />Hammond & Associates, Inc. <br />IMM MAve Y21&,101" FL 33169 <br />IV Eqm. <br />(1)FIRM NAME <br />(2)FIRMLOCATION (Cltyand State) <br />(3)ROLE <br />C. <br />(i) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3)ROLE <br />d. <br />(1)FIRM NAME <br />(2)FIRMLOCATION (Cltyand State) <br />(3)ROLE <br />e. <br />(1)FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3)ROLE <br />f. <br />STANDARD FORM 330 (RtV, f-21.118) PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.