My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CE Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
CE Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 11:21:20 AM
Creation date
8/24/2020 11:18:22 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacifico Castillo, P.E. <br />Andres Diaz, P.E. <br />Andres Penaloza, P.E. <br />Victor Diaz, P.E. <br />Joel Jara, P.E. <br />Banafsheh Hosseini, P.E. <br />Alexander Vasquez, P.E. <br />Mario Aguila, E.I. <br />Omar Hernandez <br />Javier Vega <br />Juan Pablo Bisono <br />Ernesto Bravo <br />Tania Gimenez <br />Project Principal <br />Project Manager/Senior <br />Project Engineer <br />Senior Project Engineer/ PA <br />Senior Project Engineer/ PA <br />Project Administrator <br />CEI Sr. Inspector <br />CEI Inspector <br />CEI Inspector <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />SR 907/Alton Road at Michigan Avenue <br />(Miami Beach, FL) <br /> SR. A1A Indian Creek Drive from Abbott Ave to SR. <br />907/W 63rd St (Miami Beach, FL) <br />SR. 112 Arthur Godfrey Road from Alton Road to West <br />of Pine Tree Drive (Miami Beach, FL) <br />SR 5/Biscayne Blvd from SE 3 Ave to N of SE 2 St & <br />SE 2 Ave from SE 2 St to SE 4 St (Miami, FL) <br />Miami Beach South Pointe Park (Miami Beach, FL) <br />SR 7/US 441 from NW 29th Street to N of SR 816/Oakland <br />Park Blvd (Oakland Park, FL) <br />SR 7 Improvement Projects from Commercial Boulevard to <br />Broward/Palm Beach County Line, FL <br />SR 9/I-95 at SR 824/Pembroke Road Interchange <br />Improvements Project (Hallandale Beach, FL) <br />SR 997/Krome Ave from SW 312 St to SW 296th St <br />and from SW 296 St to S of 232nd St (Miami, FL) <br />X X <br />X <br />Project Administrator <br />Project Administrator <br />CEI Sr. Inspector <br />CEI Sr. Inspector <br />CEI Sr. Inspector
The URL can be used to link to this page
Your browser does not support the video tag.