My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. BEHAR & CO.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
R.J. BEHAR & CO.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 11:25:35 AM
Creation date
8/24/2020 11:23:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Continuing Professional Consulting Services (CCNA) <br />Request for Qualifications No. 20-07-01 <br /> <br />Section E – Page | 103 <br />Awards/Commendations/Publications <br />R.J. BEHAR & COMPANY, INC. <br />Mr. Robert J. Behar, PE was nominated Engineer of the Year by the <br />Broward County Section of the Florida Engineering Society and was <br />awarded the Ben Watts Award from the Florida Department of <br />Transportation. <br /> <br /> <br /> <br />Riverwalk South Regional Park – City of Fort Lauderdale <br />RJ Behar provided full construction management services for the <br />construction of the City of Fort Lauderdale Riverwalk South <br />Regional Park. The scope included attending preconstruction <br />meeting(s); reviewing and processing payment applications, <br />approving schedule of values; monitoring and tracking the <br />contractor’s work progress and schedule; requesting and reviewing <br />schedule modifications to ensure the contractor maximized time <br />and resources; maintaining and accurately monitoring logs <br />(correspondence, submittals/ shop drawings, RFI’s, change orders, deficiency reports, payment applications); responding <br />to contractor RFI’s in a timely manner; conducting and coordinating the technical review and return of contractor submittals <br />in a timely manner; coordinating and monitoring inspection procedures and making site visits as necessary to accomplish <br />same; assisting/coordinating with Utilities (BellSouth, FP&L, cable, etc.) and City Departments as required; attending <br />neighborhood meetings and/or City Commission meetings as requested; determining the need for any change orders, <br />providing summary and justification for change as well as cost estimates; assisting in negotiations with the contractor; <br />conducting weekly/bi-weekly meetings to evaluate the contractor’s progress and to resolve issues; preparing and distributing <br />meeting minutes; overseeing substantial and final inspections, preparing and tracking punch list items; reviewing and <br />processing record drawings; and preparing certifications and close-out permits <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Commendation – City of Hialeah <br />Continuing Contract Civil <br />Engineering Utility Design <br />Consulting Services - CEI <br />Water/Sewer <br />“Service performance: Excellent “
The URL can be used to link to this page
Your browser does not support the video tag.