Laserfiche WebLink
STREET NEIGHBORHOOD IMPROVEMENTS <br /> <br />HIALEAH, FLORIDA <br />CLIENT: <br />Mr. Jose Sanchez <br />Director, Streets Division <br />City of Hialeah <br />5601 East 8th Avenue <br />Hialeah, Florida 33013 <br />Tel: (305) 687-2611 <br />Fax (305) 687-2632 <br />E-mail: JOSANCHEZ@hialeahfl.gov <br />RJ BEHAR’S ROLE: <br />Roadway design improvements, road- <br />way reconstruction, streetscape, <br />milling and resurfacing, drainage <br />design, utility coordination, main- <br />tenance of traffic, lighting design, <br />decorative lighting, signing and <br />pavement markings. <br />PROJECT STARTED: 2000 <br />PROJECT COMPLETED: Present <br />COST/FEES PAID: > $3.5M <br />CONSTR. COST: > $40M <br />RJ BEHAR’S KEY PERSONNEL <br />Robert J. Behar, PE <br />Project Manager <br />Juan H. Vazquez, PE, PH, BCEE <br />Drainage Engineer <br />Paola Riveros, PE <br />Project Engineer <br />Rafael DeArazoza, PE, PTOE <br />Traffic Studies <br />Kira Leon, PE <br />Project Engineer <br />Jerry Piccolo, PE <br />Structural Engineer <br />Jossmel Cruz Garcia, EI <br />Miscellaneous Structures <br />Michelle Leon, EI <br />Project Engineer/Inspections <br />Xamarah Seda Velez <br />Designer <br />Angel Marinez <br />Designer <br />Since the year 2000, RJ Behar & Company, Inc. (RJ Behar) has been <br />designing street neighborhood improvements for the City of Hialeah. <br />This is part of the continuous neighborhood improvement program the <br />City has been conducting. Under this program, RJ Behar has completed <br />more than 50 miles of City street improvements. <br />The projects have consisted of roadway reconstruction with some milling <br />and resurfacing, curb and gutter type f, valley gutter, sidewalks, on- <br />street parking, exfiltration drainage system, storm sewers, sodding, <br />signing and pavement markings and roadway lighting. Some of these <br />projects have included streetscaping with urban design features, <br />decorative as well as regular lighting, utility coordination, maintenance <br />of traffic plans and construction inspection services. These projects <br />included: <br />•NW 102nd Avenue from NW 138th Street to NW 142nd Street <br />•NW 102nd Avenue from NW 142nd Street to NW 145th Place <br />•E. 4th Avenue Improvements, LAP/ARRA Project <br />•W. 29th Street Improvements, from West Okeechobee Road to West <br />4th Avenue LAP/ARRA Project <br />•E. 6th Avenue to E. 8th Avenue, from Hialeah Drive to E. 5th Avenue <br />•E. 1st Avenue, E. 47th Street, E. 48th Street Reconstruction <br />•Palm Avenue from W. 45th Street to W. 47th Street <br />•Palm Avenue from W. 47th Street to W. 49th Street <br />•Palm Avenue from Okeechobee Road to E. 21st Street <br />•E. 1st Street to E. 2nd Avenue between E. 10th & E. 15th Street <br />•E. 1st Street to E. 2nd Avenue between E. 16th & E. 20th Street <br />•East 1st Avenue from Okeechobee Road to E. 21st Street <br />•W. 6th Avenue/W. 81st Street <br />•W. 7th Avenue/W. 75th Street/W. 76th Street/W. 78th Street <br />•W. 74th Street, from W. 8th Avenue to W. 12th Avenue <br />•W. 77th Street, from W. 8th Avenue to W. 4th Avenue <br />•W. 78th Street Reconstruction <br />•W. 33rd Street, from W. 4th Avenue to W. 12th Avenue <br />•W. 36th Street, W. 36th Terrace, W. 37th Street <br />•W. 37th Street, from W. 18th Avenue to W. 16th Avenue <br />•East 4th Avenue Street Assessment <br />•SE 8th Court/9th Avenue Improvements <br />•West 83rd Court Improvements <br />•East 26th, East 27th Street, East 11th Avenue Streetscape <br />Section F - Page | 1