STREET NEIGHBORHOOD IMPROVEMENTS
<br />
<br />HIALEAH, FLORIDA
<br />CLIENT:
<br />Mr. Jose Sanchez
<br />Director, Streets Division
<br />City of Hialeah
<br />5601 East 8th Avenue
<br />Hialeah, Florida 33013
<br />Tel: (305) 687-2611
<br />Fax (305) 687-2632
<br />E-mail: JOSANCHEZ@hialeahfl.gov
<br />RJ BEHAR’S ROLE:
<br />Roadway design improvements, road-
<br />way reconstruction, streetscape,
<br />milling and resurfacing, drainage
<br />design, utility coordination, main-
<br />tenance of traffic, lighting design,
<br />decorative lighting, signing and
<br />pavement markings.
<br />PROJECT STARTED: 2000
<br />PROJECT COMPLETED: Present
<br />COST/FEES PAID: > $3.5M
<br />CONSTR. COST: > $40M
<br />RJ BEHAR’S KEY PERSONNEL
<br />Robert J. Behar, PE
<br />Project Manager
<br />Juan H. Vazquez, PE, PH, BCEE
<br />Drainage Engineer
<br />Paola Riveros, PE
<br />Project Engineer
<br />Rafael DeArazoza, PE, PTOE
<br />Traffic Studies
<br />Kira Leon, PE
<br />Project Engineer
<br />Jerry Piccolo, PE
<br />Structural Engineer
<br />Jossmel Cruz Garcia, EI
<br />Miscellaneous Structures
<br />Michelle Leon, EI
<br />Project Engineer/Inspections
<br />Xamarah Seda Velez
<br />Designer
<br />Angel Marinez
<br />Designer
<br />Since the year 2000, RJ Behar & Company, Inc. (RJ Behar) has been
<br />designing street neighborhood improvements for the City of Hialeah.
<br />This is part of the continuous neighborhood improvement program the
<br />City has been conducting. Under this program, RJ Behar has completed
<br />more than 50 miles of City street improvements.
<br />The projects have consisted of roadway reconstruction with some milling
<br />and resurfacing, curb and gutter type f, valley gutter, sidewalks, on-
<br />street parking, exfiltration drainage system, storm sewers, sodding,
<br />signing and pavement markings and roadway lighting. Some of these
<br />projects have included streetscaping with urban design features,
<br />decorative as well as regular lighting, utility coordination, maintenance
<br />of traffic plans and construction inspection services. These projects
<br />included:
<br />•NW 102nd Avenue from NW 138th Street to NW 142nd Street
<br />•NW 102nd Avenue from NW 142nd Street to NW 145th Place
<br />•E. 4th Avenue Improvements, LAP/ARRA Project
<br />•W. 29th Street Improvements, from West Okeechobee Road to West
<br />4th Avenue LAP/ARRA Project
<br />•E. 6th Avenue to E. 8th Avenue, from Hialeah Drive to E. 5th Avenue
<br />•E. 1st Avenue, E. 47th Street, E. 48th Street Reconstruction
<br />•Palm Avenue from W. 45th Street to W. 47th Street
<br />•Palm Avenue from W. 47th Street to W. 49th Street
<br />•Palm Avenue from Okeechobee Road to E. 21st Street
<br />•E. 1st Street to E. 2nd Avenue between E. 10th & E. 15th Street
<br />•E. 1st Street to E. 2nd Avenue between E. 16th & E. 20th Street
<br />•East 1st Avenue from Okeechobee Road to E. 21st Street
<br />•W. 6th Avenue/W. 81st Street
<br />•W. 7th Avenue/W. 75th Street/W. 76th Street/W. 78th Street
<br />•W. 74th Street, from W. 8th Avenue to W. 12th Avenue
<br />•W. 77th Street, from W. 8th Avenue to W. 4th Avenue
<br />•W. 78th Street Reconstruction
<br />•W. 33rd Street, from W. 4th Avenue to W. 12th Avenue
<br />•W. 36th Street, W. 36th Terrace, W. 37th Street
<br />•W. 37th Street, from W. 18th Avenue to W. 16th Avenue
<br />•East 4th Avenue Street Assessment
<br />•SE 8th Court/9th Avenue Improvements
<br />•West 83rd Court Improvements
<br />•East 26th, East 27th Street, East 11th Avenue Streetscape
<br />Section F - Page | 1
|