My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. BEHAR & CO.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
R.J. BEHAR & CO.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 11:25:35 AM
Creation date
8/24/2020 11:23:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Continuing Professional Consulting Services (CCNA) <br />Request for Qualifications No. 20-07-01 <br />Section E – Page | 7 <br /> NW 8th Street at Hallandale Beach Boulevard <br /> Transportation Master Plan, Traffic Counts, City of <br />Hallandale Beach <br /> Palm Avenue Master Plan, Hialeah <br /> NW 7th/9th Connector Study, Fort Lauderdale <br /> NW 13th Street Master Plan, Fort Lauderdale <br /> US-1 Busway Study, Miami-Dade <br /> Gratigny Parkway Feasibility Study, Opa-Locka <br /> I-95 Downtown Feasibility Study <br /> Flagler Street Master Plan, Miami <br /> E. 1st Avenue Master Plan, Hialeah <br /> <br />Major traffic analysis projects included: <br /> NW 87th Avenue - Traffic Study <br /> Coral Springs Neighborhood Transit Center <br /> Grand Palms - Traffic Study <br /> Palm Avenue at 17th Street Roundabout Intersection Analysis <br /> Powerline Road Access Management <br /> 1st Avenue Traffic Analysis, Hialeah <br /> Town Traffic Study-Town of Southwest Ranches <br /> <br />Roadway Design <br />RJ Behar began as a roadway design firm. Our primary expertise is roadway design <br />and most of our other areas of expertise came by way of roadway design or by supplementing our roadway design <br />capabilities. Our comprehensive roadway design experience and expertise includes: Roadway Plans, Traffic Studies, Signal <br />Design, Pavement, Marking & Signing Design, Traffic Control Plans, Lighting Plans, Drainage & Permitting, Utility Relocation <br />Plans and Public Involvement. <br />Our staff has extensive roadway design experience including <br />design of major arterial roadways such as: <br /> SR-845/Powerline Road, FDOT D4 <br /> Atlantic Boulevard/Rock Island Road, Margate <br /> US-1/SR-5, FDOT D4 <br /> SR-A1A, FDOT D4 <br /> Andrews Avenue, Pompano Beach – FDOT D4 <br /> NW 44th Street, Lauderdale Lakes <br /> SR-907/Alton Road, FDOT D6 <br /> S.W. 27th Avenue, FDOT D6 <br /> SR-94/Kendall Drive, FDOT D6 <br /> SR-25/Okeechobee Road, FDOT D6 <br /> Turnpike Widening in Broward County <br /> I-595 Improvement Project, FDOT D4 <br /> <br />We also have extensive roadway design experience on local city streets such as NW 44th Street in Lauderdale Lakes, E. <br />Palomino Drive and S.W. 62nd Court in the Town of Southwest Ranches, Bayshore Drive in Miami, N.W. 13th Street and N.E. <br />15th Avenue in Fort Lauderdale, and 19 miles of street resurfacing in the City of Tamarac. <br /> <br />Traffic Planning <br />RJ Behar has developed expertise in the Transportation Planning and Traffic Engineering field. RJ Behar has become very <br />familiar with the Manual of Uniform Traffic Control Devices (MUTCD), The Florida Greenbook (voting member), Florida <br />NW 8th Street at Hallandale Beach Boulevard <br />I-595 <br />NW 87th Avenue
The URL can be used to link to this page
Your browser does not support the video tag.