|
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person)
<br />
<br />12. NAME
<br />JOYCE LEDAN, EI
<br />
<br /> 13. ROLE IN THIS CONTRACT
<br />Civil/Site Design, Parks; Drainage
<br />Improvements, Stormwater, Pumps,
<br />Water & Sewer
<br />
<br /> 14. YEARS EXPERIENCE
<br />
<br /> a. TOTAL
<br />3
<br />
<br /> b. WITH CURRENT FIRM
<br />1
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />R.J. BEHAR & COMPANY, INC.
<br />6861 SW 196th Avenue, Suite 302
<br />Pembroke Pines, FL 33332
<br />
<br />
<br />
<br />
<br />16. EDUCATION (Degree and Specialization)
<br />B.S. in Engineering, Florida Atlantic University, August 2019
<br />
<br /> 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />Engineer Intern #: 1100023421, 2020
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Mr. Ledan is a young engineer currently working in design and plans preparation for miscellaneous civil engineering projects. She
<br />is proficient in Microsoft Project, AutoCAD Civil3D, and Microstation.
<br />
<br />19. RELEVANT PROJECTS
<br />
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Charles Avenue from SW 37th Avenue to Main Highway, Miami-Dade County,
<br />Florida – City of Miami
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Designer who is assisting with the plans preparation for the engineering services including milling & resurfacing, localized drainage
<br />improvements, ADA upgrades, utility coordination, permitting, signing and pavement marking.
<br />Project #: B-183612 Project Length: 0.542 miles; Cost/Fees Paid: $93,396.21; Construction Cost: $1,029,528.51 (Estimate).
<br />
<br />b.
<br />
<br />(1) TITLE AND LOCATION (City and State)
<br />Lyons Park Neighborhood Improvement Project – Final Design, Broward County,
<br />Florida – City of Pompano Beach
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Designer was responsible for assisting with the plan’s preparation of the stormwater design of the proposed improvements. The project
<br />area suffers from flooding problems as documented in the City Stormwater Master Plan (SWMP). This project intends to improve the drainage
<br />systems within the project area. Cost/Fees Paid: $410,000.00; Construction Cost: $10,800,000 (Estimate).
<br />
<br />c.
<br />
<br />(1) TITLE AND LOCATION (City and State)
<br />SW 136th Street from US-1 to Old Cutler Road, Miami-Dade County, Florida –
<br />Village of Palmetto Bay
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2020
<br />
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Designer: She assisted with plans preparation, drainage design plans and calculations. Scope of services includes project management,
<br />roadway analysis and plans, signing and pavement marking, permitting, utility coordination, and civil engineering services necessary for roadway
<br />and drainage improvements. She also attending the Public Meeting.
<br />The primary challenge for this project was accommodating the proposed sidewalks and bicycle lanes in a right of way constrained corridor.
<br />Cost/Fees Paid: $193,171.00; Construction Cost: $1,700,345.00 (Estimated); Project Length: 1.75 Miles.
<br />
<br />d.
<br />
<br />(1) TITLE AND LOCATION (City and State)
<br />45 Year Community Development Block Grant, NW 7th Avenue and 3rd Court
<br />Drainage, Broward County, Florida – City of Hallandale Beach
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2020
<br />
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Engineer: was responsible for preparing the plans for roadway and drainage improvements. The project utilizes French drains to
<br />improve flooding conditions within the neighborhood. Cost/Fees Paid: $32,000; Construction Cost: $177,000.
<br />e.
<br />
<br />(1) TITLE AND LOCATION (City and State)
<br />Russian Colony and Seawall Expansion Programming Documents, Miami-Dade
<br />County, Florida – Town of Medley
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Designer who is assisting with the plans preparation for the roadway reconstruction, one signal modification, a new drainage system,
<br />lighting, utility coordination, signing and pavement marking, and permitting.
<br />Cost/Fees Paid: $101,292.00 ; Construction Cost: $9,915,988.85 (Engineer’s Probable Cost).
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />
<br />Section E - Page | 29
|