My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. BEHAR & CO.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
R.J. BEHAR & CO.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 11:25:35 AM
Creation date
8/24/2020 11:23:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br /> 20. EXAMPLE PROJECT KEY <br /> NUMBER <br />6 <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />CULTURAL PARK <br />CITY OF HIALEAH, FL <br /> PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER City of Hialeah <br />900 East 56th Street, Building No 1 <br />Hialeah, FL 33013 <br />b. POINT OF CONTACT NAME Mr. Vicente Rodriguez <br />Director of Construction and <br />Maintenance <br />c. POINT OF CONTACT TELEPHONE NUMBER Tel: (305) 687-2620 <br />E-mail: VRodriguez@hialeahfl.gov <br /> 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />R.J. Behar & Company, Inc. (RJ Behar) was contracted by the City of Hialeah to civil site design for the Cultural Park <br />between W. 75th Street and West 76th Street from W 19th Court to W 17th Avenue to north of W 18th Lane within Hialeah. <br />The project included a new parking lot, grading the ball fields. The services entailed paving, grading, and drainage plans. <br />The plans required permitting by the DRER and the City of Hialeah. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Cost/Fees Paid: $37,903.00Change Orders:2=$20,000Construction Cost: $475,000.00Project Started: 4/26/2013 <br /> Project Completed: 10/2/2015 <br /> <br />Key Personnel: <br />Robert J. Behar, PE – Principal in Charge Javier Rodriguez, PE – Project Manager Yulet Miguel, PE – Project <br />Engineer Andrea Virgin, PE, LEED AP – Project Engineer Mariana Urdaneta – Technician <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> a. <br /> (1) FIRM NAME <br />R.J. BEHAR & COMPANY, INC. <br /> (2) FIRM LOCATION <br />6861 SW 196th Avenue, Suite 302 <br />Pembroke Pines, FL 33332 <br /> (3) ROLE <br />Park, landscaping, concrete sidewalk, <br />signing and pavement marking, drainage, <br />cost estimates, and utility coordination. <br />STANDARD FORM 330 (1/2004) <br />Section E - Page | 42
The URL can be used to link to this page
Your browser does not support the video tag.