Laserfiche WebLink
STANDARD FORM 330 (REV. 8/2016) PAGE 19 <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />General Engineering Contract, <br />City of Doral, Miami-Dade County, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 – Ongoing <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />E Sciences has provided a variety of consulting services to the City of Doral through their General Engineering Contract. <br />Services have included grant writing, a city-wide tree inventory conducted in three phases, a city-wide planting plan, educational <br />programing and materials related to tree care and an environmental sampling project conducted to investigate odor complaints. <br />Mr. Freedman serves as the project manager and primary client contact for these projects. Contract Budget/Fees: $171,969 <br /> <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Sullivan Park Expansion Project, <br />City of Deerfield Beach CRA, Broward County, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2013 – 2016 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />The City of Deerfield Beach CRA received grant funding to improve its Sullivan Park property located on the Intracoastal <br />Waterway. Improvements include upland features (i.e. new bathroom facilities, a splash park, landscaping, etc.) and in-water <br />infrastructure including a dock for kayaking and paddle boarding and finger piers for boats. E Sciences was engaged by the <br />project design firm to initially assist with the master plan and then to provide permitting support during design. E Sciences’ <br />services include conducting a benthic resource survey, coordinating with the permitting agencies and preparing permit <br />applications. Mr. Freedman was the project manager for this project. Project Budget/Fees: $41,833 <br /> <br />f. <br />(1) TITLE AND LOCATION (City and State) Gilbert Samson Oceanfront Park Coastal Construction Control Line Permit, <br />City of Sunny Isles Beach, Broward County, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2014 – 2015 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />The City is improving the Samson Oceanfront Park and hired a firm to design the improvements. E Sciences joined the team to <br />provide the Coastal Construction Control Line permitting for the project. Tasks included conducting vegetative analysis and <br />mapping for the site and preparing permit applications. Mr. Freedman serves as project manager. Project Budget/Fees: $6,945 <br /> <br />g. <br />(1) TITLE AND LOCATION (City and State) Historic Vizcaya Southern Lagoon & Northern Canal Tidal Swamp Landscape <br />Environmental Restoration Plan, Miami, Miami-Dade County, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2012 – 2014 <br />CONSTRUCTION (If applicable) <br />South Canal – 2014 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />This project involved a multi-disciplinary landscape architecture and environmental restoration plan for the waterways and tidal <br />pool within the museum’s property, which balanced ecological function with creative landscape aesthetics, recreational functions <br />and values, and improvements to water quality, and planting designs based on historic flora inventories, including mangroves, <br />native hardwood hammock and coastal scrub species. Mr. Freedman served as the project manager for the construction <br />administration portion of this project, including evaluating contractor qualifications and conducting compliance inspections. <br />Project Budget/Fees: $123,412 <br /> <br />h. <br />(1) TITLE AND LOCATION (City and State) <br />FDOT District Four Districtwide Environmental Services Contract <br />Broward, Palm Beach, Martin, St. Lucie and Indian River Counties <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2005 – 2010 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Mr. Freedman served three days a week as in-house environmental specialist in the FDOT District Four Planning and <br />Environmental Management Office. Tasks included performing environmental phase reviews and preparing and reviewing NEPA <br />documentation for over 70 roadway and bridge projects including field identification of listed species habitat, wetlands, historic <br />resources, Section 4(f) and contaminated sites. Contract Budget/Fees: $6,857,273 <br /> <br />i. <br />(1) TITLE AND LOCATION (City and State) <br />River Oaks Preserve Stormwater Park <br />City of Fort Lauderdale, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2011 – 2012 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />The purpose of the project was to create a passive stormwater park with wetland features to relieve flooding in the River Oaks <br />neighborhood and provide recreational use for local residents. Mr. Freedman provided permitting support for this project. Project <br />Budget/Fees: $29,757 <br />