My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
E Sciences
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
E Sciences
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 1:48:05 PM
Creation date
8/24/2020 1:46:54 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
STANDARD FORM 330 (REV. 8/2016) PAGE 41 <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY NUMBER <br />8 <br />21. TITLE AND LOCATION (City and State) Continuing Engineering Services, <br />Islamorada, Village of Islands, Monroe County, Florida <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES 2001 – Ongoing CONSTRUCTION (If applicable) N/A <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER Islamorada, Village of Islands b. POINT OF CONTACT NAME Cheryl Cioffari c. POINT OF CONTACT TELEPHONE NUMBER (305) 664-6422 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost.) <br />E Sciences has provided a variety of environmental engineering consulting services for Islamorada, Village of Islands, (Village) <br />including the following: <br /> <br />Interim Director of Public Works: During transition between Village Public Works Directors, E Sciences was requested to fulfill <br />the duties of the director on an interim basis. The transition took place during a critical phase of infrastructure growth — the Village <br />was constructing its first wastewater treatment plant and collection system. E Sciences' role involved managing and overseeing <br />multiple functions related to public works projects, including stormwater, wastewater and other capital improvement projects. <br /> <br />Wastewater Treatment Alternatives Analysis: E Sciences prepared a feasibility study and cost comparison to assist Islamorada <br />in deciding whether to treat wastewater on-island or send all or a portion of it to a consolidated plant being constructed in Key <br />Largo for treatment. This study involved a conceptual design of a transmission system from Key Largo to Islamorada, including <br />all related wastewater facilities. We estimated capital and operational costs for four on-site wastewater treatment plants as well <br />as a conveyance system to Key Largo’s plant. Costs for the various scenarios were compiled and summarized to provide five <br />alternatives for consideration. Additional considerations included construction and hook-up phasing, legal issues, environmental <br />considerations, aesthetics, limited land availability, and legal issues. E Sciences met with the Village’s Water Quality Improvement <br />Citizens' Advisory Committee and presented the findings to the Village Council. <br /> <br />Stormwater Technical Manual: E Sciences prepared a Stormwater Technical Manual for the Village in order for them to provide <br />guidance to engineers and developers that are preparing stormwater management plans for site development within the Village. <br />The manual outlined the Village requirements and provided forms to streamline the review process for simple projects. In 2016, <br />E Sciences updated this manual to incorporate modern technologies and stormwater management practices to promote design <br />and development using technologies that are more sustainable and applicable to the uniqueness of the Village. <br /> <br />Stormwater Plan Reviews: The Village provides E Sciences with stormwater management plans for new developments and <br />redevelopments that are submitted to planning and zoning. E Sciences reviews the plans for consistency with the Village’s <br />ordinances, land development regulations and Stormwater Technical Manual. Review letters providing our opinions and requests <br />for additional information, if appropriate, are provided at the conclusion of the <br />reviews. Reviews are typically completed within three to five days. <br /> <br />Wastewater Master Plan Due Diligence and Regulatory Compliance <br />Assessment: E Sciences projected probable demand for reuse water, <br />evaluated a full-service package wastewater treatment facility scenario, and <br />assessed comparative mass nutrient loading and regulatory compliance <br />issues. A regulatory compliance assessment was also performed which <br />assessed (based on actual performance data of existing facilities currently <br />operating in the Village) the reliability of producing compliant wastewater <br />treatment effluent if a complete network of package wastewater treatment <br />facilities was constructed. FDEP data records were reviewed regarding the <br />compliance history of package wastewater treatment facilities currently <br />operating within the Village. <br />
The URL can be used to link to this page
Your browser does not support the video tag.