My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
E Sciences
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
E Sciences
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 1:48:05 PM
Creation date
8/24/2020 1:46:54 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
STANDARD FORM 330 (REV. 8/2016) PAGE 47 <br /> <br /> <br /> <br />Construction activities associated with the corrective actions implemented at the site, led to the abandonment of monitoring wells <br />across the site. DERM requested that a monitoring well replacement plan be submitted for review and approval upon completion of <br />construction activities. Additionally, DERM noted that due to the presence of iron levels exceeding Miami-Dade County background <br />levels; offsite delineation of the groundwater contaminant plume may be required. E Sciences was engaged by the City to install <br />replacement wells and conduct groundwater sampling activities to evaluate the current groundwater contamination plume and develop <br />the proposed course of action based on results. E Sciences <br />completed well installation and groundwater sampling activities <br />documented in a Groundwater Monitoring Well Installation and <br />Sampling Report dated November 17, 2017 and a subsequent <br />Groundwater Monitoring Report dated March 5, 2018. In <br />correspondence dated December 11, 2017, DERM requested <br />that additional delineation of the iron impacts. E Sciences is <br />awaiting approval from the City to proceed with additional well <br />installation and sampling activities. <br /> <br />The City is currently planning the construction of park amenities <br />for the residents. The amenities will consist of a Community <br />Center, a rubberized playground and an exercise equipment area <br />and will be subject to the corrective action plan requirements. The <br />City engaged E Sciences to prepare environmental documents <br />that will be required to be provided to the Miami-Dade County for <br />review during the permitting process or as a permit condition. <br /> <br />E Sciences has drafted environmental specifications for the <br />contractor to manage solid waste or contaminated materials that <br />may be generated during construction activities based on review <br />of regulatory data documented at the site and approved <br />regulatory documents. These specifications provide guidelines to the contractor for handling the buried solid waste or contaminated <br />media, and how to track and properly dispose of the material and includes provisions for the contractor to implement to ensure that <br />the engineering control areas that are breached will be properly repaired/replaced. <br /> <br />E Sciences has also developed a health and safety plan (HASP) and air monitoring plan (AMP) to be implemented by the contractor <br />during construction. The AMP outlines air monitoring to be conducted during construction to monitor the ambient air and threshold <br />values that may trigger personal protective equipment and/or corrective actions to reduce emissions. The AMP was developed for <br />the specific park conditions and proposed construction based on general guidelines previously approved by DERM for construction <br />activities in multiple parks across the city. <br /> <br />The City has requested that E Sciences provides air monitoring, field documentation and regulatory reporting associated with the <br />implementation of EC repairs at the Site and installation of the playground and exercise equipment area. As part of this scope, <br />E Sciences will oversee and certify the installation of the EC across affected areas. <br /> <br />Contract Budget/Fees: $378,048 <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. (1) FIRM NAME E Sciences, Incorporated (2) FIRM LOCATION (City and State) Fort Lauderdale & Miami, Florida <br />(3) ROLE Prime Consultant <br />b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
The URL can be used to link to this page
Your browser does not support the video tag.