Laserfiche WebLink
<br /> STANDARD FORM 330 (REV.8/2016) PAGE 25 <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) <br />19. RELEVANT PROJECTS <br />c. <br />(1) TITLE AND LOCATION (City and State) Bell Avenue Stormwater Improvements CEI Services, City of Melbourne, Brevard County, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Mr. Shearer was the engineer of record responsible for construction oversight services for stormwater retrofit improvements <br />including the construction of two 2nd generation nutrient separating baffle boxes in line with two parallel 48” pipes prior to <br />discharge into a stormwater drainage ditch. E Sciences developed construction plans and specifications, including an engineer’s <br />cost estimate and other information necessary for bid documents for the proposed improvements. The installation required an <br />open cut into the existing pipes so that the structures could be inserted into place. The project site lies within the North Central <br />Indian River Lagoon portion of the City’s MS4 and this project improved water quality treatment by reducing the stormwater <br />pollutants for the drainage basin by 358 lb/yr of Total Nitrogen and 72 lb/yr of Total Phosphorus. Additionally, one of the baffle <br />boxes contains an upflow filter with BAM for enhanced nutrient removal, and the performance of this box is being monitored and <br />compared against the box without BAM. Mr. Shearer was responsible for CEI services for this project which involved performing <br />and coordinating site inspections during all stages of construction, inspection documentation, addressing requests for <br />information, review and approval of shop drawings, evaluation of deviations from approved plans, claims review, review and <br />approval of pay applications, construction completion certification, and development and submittal of Record Drawings. <br />Construction of this project was completed in May 2017. Project Budget/Fees: $24,861 <br /> <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />North and South Garfield Stormwater Improvements and CEI Services, <br />City of Melbourne, Brevard County, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If applicable) <br />5/2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Mr. Shearer was the engineer of record responsible for construction oversight services for stormwater retrofit improvements <br />including the construction of two second-generation nutrient separating baffle boxes to replace two underperforming dry <br />detention ponds. The second-generation nutrient baffle boxes are designed to remove sediment, foliage, and litter with minimal <br />hydraulic head loss. E Sciences developed construction plans and specifications, including an engineer’s cost estimate and <br />other information necessary for bid documents for the proposed improvements. This project is located in a high-density <br />residential neighborhood, and the outfall for this project flows directly into an impaired waterbody. The project site lies within the <br />North Indian River Lagoon portion of the City’s MS4 and the project improved water quality treatment by reducing the stormwater <br />pollutants for the drainage basin by 221 lb/yr of Total Nitrogen and 44 lb/yr of Total Phosphorus. Mr. Shearer was also <br />responsible for CEI services for this project that involved performing and coordinating site inspections during all stages of <br />construction, inspection documentation, addressing requests for information, review and approval of shop drawings, evaluation <br />of deviations from approved plans, claims review, review and approval of pay applications, construction completion certification, <br />and development and submittal of Record Drawings. Construction of this project was completed in May 2017. Project <br />Budget/Fees: $69,452 <br /> <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Wynwood NW 3rd Avenue Woonerf, <br />City of Miami, Miami-Dade County, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />7/2018 – Ongoing <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />This project involves the conversion of four blocks of urban hardscape in the heart of the Wynwood art district from NW 25th street <br />to NW 29th street into a “woonerf” which is a Dutch-inspired, pedestrian friendly “living” complete street incorporating green design <br />elements, ecological benefits, and pedestrian safety. Mr. Shearer is the project manager and project engineer providing stormwater <br />engineering design and environmental specialist services including innovative stormwater retrofits involving Low Impact <br />Development design for this unique, green streetscape project. He managed the environmental site analysis and vulnerabilities and <br />resiliency assessment which included heat island effect considerations, energy resource considerations, stormwater and green <br />infrastructure assessment, community outreach and site design related to the stormwater and environmental aspects of the project. <br />The project is a pilot project designed to showcase and scale-up resiliency and adaptation design measures, and a variety of <br />climate-change oriented sensors, metrics and grant funding approaches. This project features stormwater design conveying green <br />infrastructure such as permeable pavement with underground storage and bio-retention planting areas; tree planter retention areas <br />with structural soils; bio-sorption activated media; bioswales; cisterns; above-ground rain tanks; solar power; stormwater <br />engineering art; and climate change concepts through public education and outreach. Project Budget/Fees: $21,699 <br />