My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
E Sciences
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
E Sciences
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 1:52:13 PM
Creation date
8/24/2020 1:51:21 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
STANDARD FORM 330 (REV. 8/2016) PAGE 42 <br /> <br />Request for Proposals Development and Wastewater Rate Study: <br />E Sciences prepared a RFP for the design, construction and implementation of a <br />wastewater treatment facility and collection system to serve North Plantation Key. <br />E Sciences assisted the Village with securing a design/build team for Phase I <br />North Plantation Key/North Plantation Key Colony Wastewater Treatment and <br />Collection System. Staff members researched technical specifications and <br />reviewed the Preliminary Design Report for North Plantation Key Colony/North <br />Plantation Key Wastewater Collection System as well as the Monroe County <br />Wastewater Master Plan to prepare the technical RFP for the Village. E Sciences <br />attended several meetings including Village Council Meetings, meetings with <br />Village staff and Water Quality Committee Meetings. Staff worked closely with the water quality committee to address the <br />communities’ concerns in the RFP. E Sciences evaluated proposals submitted by bidders, ranked firms on technical merit and <br />conducted interviews on behalf of the Village. We then shortlisted the bidders and conducted a second round of interviews to <br />choose the Design/Builder. E Sciences assisted the Village in negotiations with the potential Design/Builder and helped to secure <br />a Design/Build Agreement. <br /> <br />Program Management / Plantation Key Wastewater Treatment Facility: E Sciences provided Engineering Support Services <br />to the Village of Islamorada for the design and construction of the North Plantation Key (NPK) wastewater treatment facility and <br />collection system. The NPK project entailed the construction of a 0.355 MGD-MMADF wastewater treatment facility using a <br />membrane bioreactor activated sludge biological nutrient removal treatment process. The project also includes a vacuum <br />collection system with eight miles of vacuum sewer piping and force main. Construction of a reclaimed water system with 3.5 <br />miles of transmission main was also part of the project. Construction was accomplished through two design/build contracts. <br />E Sciences’ role extended throughout the project. Our initial responsibilities included the preparation of technical Request for <br />Proposals (RFPs) for the two phases of this project. During the most recent contractor selection process, E Sciences provided <br />two engineers to participate in the selection committee. E Sciences negotiated with the contractor on behalf of the Village and <br />also was a lead participant in ensuring that the Village was able to receive $6.5 million in grant funding by contributing technical <br />ideas and research and project management services to ensure that ambitious grant-related milestones were met. E Sciences <br />also supported the Village in the selection of the treatment plant operation and maintenance (O&M) contractor through the <br />preparation of an RFP and participation in the selection committee. E Sciences acted as the Village’s Design Consultant during <br />the design phase of each NPK project. In this role we performed detailed reviews of plans and specifications for compliance with <br />the contract documents, industry standards, constructability, ease of maintenance and other issues important to our client. During <br />the construction phase of each project we performed construction engineering and inspection services. This included reviewing <br />shop drawings, attending and participating in progress meetings, performing site inspections, reviewing the contractor’s pay <br />applications, evaluating change orders, oversight during the testing and acceptance phase, evaluating technical issues that arose <br />during construction and offering solutions, and performing final inspections and developing punch lists. We also tracked the tasks <br />required to transition from the construction phase to the operational phase and coordinated the construction and O&M contractors’ <br />activities to ensure a smooth transition. <br /> <br />Construction Engineering Services: E Sciences provided CEI and engineering support <br />services for the NPK / NPK Colony Wastewater Treatment Facility and Collection System <br />in Islamorada, Florida. E Sciences prepared the technical RFP for Phase I NPK Colony <br />Wastewater Treatment Facility and Collection System and assisted the Village with <br />securing a Design/Builder for the project. Staff served as the design consultant for the <br />Village of Islamorada for this project. Responsibilities included plans and specifications <br />review; shop drawing reviews; general CEI services, including on-site inspections; payment <br />application processing; and interaction between the client and the Design/Builder. <br />E Sciences conducted weekly site inspections and attended monthly progress meetings. <br />These tasks also included negotiating a change order to expand the wastewater treatment facility from a 0.1 MGD-AADF facility <br />to the current 0.25 MGD-AADF facility. E Sciences services included assistance with negotiations with regulatory agencies and <br />permitting, CEI, RFP bid evaluation, biological survey, wetland delineation, and turbidity reports. <br />
The URL can be used to link to this page
Your browser does not support the video tag.