<br /> RFQ-20-07-01
<br />Continuing Professional Consulting Services (CCNA)
<br />
<br /> 790 NW 107 Ave., Suite 200, Miami, FL 33172
<br /> Tel:(786) 456-7700 (954) 658-5232 11
<br />
<br />E. QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL
<br />
<br />Key Team Personnel and Experience:
<br />
<br />Based on this experience and expertise, CALTRAN has assembled key staff to provide the services required to execute
<br />the tasks for this contract. Following are descriptions of key team members.
<br />
<br />
<br />Name Type of
<br />Projects
<br />Contract
<br />Involvement
<br />Recent Significant Experience
<br />Contract Task Assignments
<br />Juan
<br />Calderon,
<br />P.E., PTOE,
<br />RSP
<br />
<br />
<br />
<br />Traffic and
<br />Transportation
<br />Engineer on
<br />record (EOR)
<br />and Project
<br />Manager
<br />FDOT D6 Traffic Operations Studies Signal warrant analyses, bottleneck analysis,
<br />Qualitative Assessment and safety
<br />City of Miramar Intersection Improvements Signalization, Signing and Pavement Markings,
<br />Roadway Design
<br />City of Oakland Park Traffic Consultant Traffic calming, roundabout design, traffic impact
<br />reviews
<br />Moe
<br />Lavasani,
<br />PhD., PE
<br />Traffic and
<br />Transportation
<br />Deputy Project
<br />Manager
<br />Card Sound Road Feasibility Study Modeling, traffic demand analysis
<br />FDOT D4, SR 80/Southern Blvd at Sansbury
<br />Way/Lyons Rd Intersection Improvements, Traffic study as part of intersection improvements
<br />NW 3rd Ave/NW 1st Ave between NW 29th
<br />St/NW 25th St (Wynwood) Lane Elimination
<br />Study
<br />Complete Streets to reconfigure two-way streets to
<br />one-way 16-ft wide street with 39-ft walkway on
<br />both sides
<br />Jeannelia
<br />Liu, P.E.
<br />Traffic and
<br />Transportation QA/QC Manager
<br />FDOT D4, R-5/US-1 Transit improvements
<br />from Miami-Dade County Line to SR-
<br />842/Broward Blvd,
<br />Design of transit improvements to bus shelters and
<br />TSP implementation at 18 intersections
<br />FDOT District 4, Districtwide Rail Consultant Evaluated condition of railroad crossing surfaces on
<br />S FL rail Corridor main line in Palm Beach.
<br />Carlos
<br />Perez, P.E.
<br />Traffic and
<br />Transportation
<br />Data Collection
<br />Manager
<br />FDOT D4. Traffic Operations Data
<br />Collection Consultant
<br />Multiple assignments, included TMCs, pedestrian
<br />studies, gaps studies, documentation of Intracoastal
<br />Waterway Bridge
<br />PD&E Master Plan Data Collection for I-95
<br />Interchanges
<br />Traffic data collection existing conditions report,
<br />including traffic counts, volume, speed and
<br />classification counts including I-95 interchange,
<br />Patricia
<br />Valencia,
<br />P.E.
<br />Traffic and
<br />Transportation Design Manager
<br />FDOT D4, Local Agency Program
<br />Coordinator,
<br />Reviewed plans, cost estimates, bid documents,
<br />invoices.
<br />Bayview Dr. from SR-838/Sunrise Blvd to
<br />SR-870/Commercial Blvd, Oakland Park
<br />Sidewalks, FDOT D4
<br />Sidewalks, drainage improvements, roadway, etc to
<br />implement mid-block crossings with rapid
<br />rectangular flashing beacons (RRFB), raising
<br />intersections, roundabouts.
<br />Juan Pablo
<br />Romero, E.I.
<br />Traffic and
<br />Transportation
<br />Sr Traffic
<br />Engineering
<br />Continuing Architectural and Engineering
<br />Services, City of Miami Gardens
<br />Traffic impact peer review process for Walmart,
<br />Family Dollar Store, and Top Golf driving range.
<br />Magnolia Bay-City of Greenacres Feasibility of Speed-Humps
<br />Michael
<br />Hernandez
<br />Traffic and
<br />Transportation Sr Designer
<br />FDOT D4. SR-708/Blue Heron Blvd
<br />and Ave S.
<br />Intersection improvements new signalization and
<br />lighting
<br />Sun Life/HARD ROCK Stadium Large events MOT plans
<br />Patricia
<br />Valencia,
<br />P.E.
<br />CEI CEI Director
<br />FDOT D4, Local Agency Program
<br />Coordinator
<br />Reviewed plans, cost estimates, bid documents,
<br />invoices.
<br />Sidewalks, drainage improvements, roadway, etc to
<br />implement mid-block crossings with rapid
<br />FDOT D4, Bayview Dr. from SR-838/Sunrise
<br />Blvd to SR-870/Commercial Blvd, Oakland
<br />Park Sidewalks
<br />Sidewalks, drainage improvements, roadway, etc to
<br />implement mid-block crossings with rapid
<br />rectangular flashing beacons (RRFB), raising
<br />intersections, roundabouts.
<br />Hector
<br />Hartmann CEI Specialized
<br />Inspector
<br />FDOT D4, Districtwide Rail Consultant
<br />Performing visual inspection of full railroad-roadway
<br />crossing area to identify deficiencies and to
<br />determine railroad crossing conditions
<br />FDOT D6, Modal Development Inspection
<br />Services
<br />Conducting ERC plans review assist in case
<br />variances are needed, review and prepare flagging
<br />and grade separation railroad reimbursement
<br />agreements, coordinate with SFRTA and transmit
<br />the designers all comments.
<br />Maynor
<br />Noguera CEI CEI Inspector FDOT D4, Districtwide Rail Consultant
<br />Performing visual inspection of full railroad-roadway
<br />crossing area to identify deficiencies and to
<br />determine railroad crossing conditions
|