Laserfiche WebLink
STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br />7 <br />21. TITLE AND LOCATION (City and State) <br />FDOT D6, DW Freight Logistics and Passenger Service OPS Consultant Services <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2013-2018 <br />. <br />CONSTRUCTION (If applicable) <br />23. PROJECT OWNER'S INFORMATION <br />a.PROJECT OWNER <br />FDOT D6 <br />b.POINT OF CONTACT NAME <br />Dionne Richardson <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(305) 470-5292 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />Served as Project Manager or EOR; included providing general management support, researching freight plans and ongoing freight project <br />development, brainstorming advisory of freight and transit strategies and potential objectives for existing and future projects, reviewing freight <br />and transit national and international trends, performing field assessments, assisting management with internal/ external coordination of <br />stakeholders. For MDT Bus System Evaluation, served as support for FDOT System Safety and Security Reviews of MDT, compliance with <br />requirements of 14-90 FAC; assessed MDT documents such as System Safety Program Plan, System Security and Emergency Preparedness <br />Plan, operating procedures; included on-site visits for triennial review activities; provided briefings of findings and reporting. For MOT Design, <br />designed MOT for proposed closures, coordinated with stakeholders and MOT contractor, prepared plans including tabulation of quantities, <br />notes, detour route plans, coordinated plan reviews. For Construction Engineering and Inspection, provided personal to audit rehabilitation of <br />FEC and CSX railroad crossing in Miami; included maintaining log of all activities performed by contractor in construction ar ea and supply of <br />inspector/engineer during scheduled time of construction; staff provided report of all activities and equipment used. <br />Total Cost: $ 1,550,000.00 <br />a. <br />(1) FIRM NAME <br />CALTRAN Engineering Group, Inc. <br />(2) FIRM LOCATION (City and State) <br />Miami, Florida <br />(3) ROLE <br />Prime Consultant <br />b. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />c. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />f. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE