My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Caltran
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Caltran
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 2:49:34 PM
Creation date
8/24/2020 2:48:50 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> RFQ-20-07-01 <br />Continuing Professional Consulting Services (CCNA) <br /> <br /> 790 NW 107 Ave., Suite 200, Miami, FL 33172 <br /> Tel:(786) 456-7700 (954) 658-5232 22 <br /> <br />Project Name: NW 3rd Ave & NW 1st Ave, Between NW 29th St. & NW 25th St. <br />(2019-Ongoing) <br /> <br /> <br /> <br />Description: A Complete Street concept and Lane Elimination was proposed by the Wynwood Business <br />Improvement District (BID) to Miami-Dade County along two corridors, the N.W. 3rd Avenue and N.W. 1st <br />Avenue, from N.W. 29th Street to N.W. 25th Street, within City of Miami. As part of the scope, <br />CALTRAN studied the impact of lane elimination by collecting Turning Movement Count at 19 intersection, <br />Traffic Volume Counts at 3 locations and also using SERPM model to assess traffic diversion due to lane <br />elimination for N.W. 1st Avenue and N.W. 3rd Avenue to parallel facilities. Synchro 10.0 was utilized to explore <br />existing, future build and future no build scenarios. Also speed reduction along both segments were validated <br />using 85th % speed data collection <br />Client: Manny Gonzalez <br /> 2451 North Miami Avenue, Suite 3, <br />786-615-8828 <br /> <br />Fee: 27,000.00 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.