Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />a. PROJECT OWNER <br />21. TITLE AND LOCATION (City and State) <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br />a. <br />b. <br />c. <br />d. <br />e. <br />f. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />(3) ROLE <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />b. POINT OF CONTACT NAME <br />23. PROJECT OWNER'S INFORMATION <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />p. 83 <br />SR9 (I-95) from Atlantic Ave to North of Gateway and Atlantic Ave at I-95 <br />Interchange and Congress Ave (Delray Beach, Florida) FDOT District 4 <br />Florida Department of Transportation <br />Eisman & Russo, Inc. Construction Engineering and Inspection <br />Consultant <br />Delray Beach, Florida <br />Eisman & Russo is providing Construction Engineering and Inspection (CEI) Services for this two-project grouping with <br />anticipated completion in 2020. The I-95 improvements have been completed and consist of milling and resurfacing, <br />drainage improvements, curb and gutter, sidewalks, driveways, detectable warnings, guardrail, rumble strips, signing and <br />pavement markings, and traffic monitoring sites along SR 9 (I-95) inclusive of southbound I-95 from south of L30 Canal to <br />north of Gateway Boulevard, and northbound I-95 from south of Boynton Beach Boulevard to north of Gateway Boulevard, <br />for nearly 8 miles. <br />The SR 806 Atlantic Avenue improvements consist of milling and resurfacing, gravity walls, retaining walls, drainage <br />improvements, including French drain, guardrail, signing and pavement markings, sign structures, lighting, fiber optic and <br />ITS with CCTV video and ethernet, internally illuminated and electronic display signs, signalization, vehicular detection, <br />pedestrian detectors, and traffic monitoring sites along Atlantic Ave at the SR 806/I-95 Interchange from E4 Canal to W <br />12th Ave in the City of Delray Beach. <br /> <br /> <br /> <br />Kevin Micocci P.E. <br />1 <br />561-719-7793 <br />Anticipated Late 2020