Laserfiche WebLink
screens <br />ÅFSLIST: CN412JL.SASOP¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢Õ <br />… Command ===> … <br />… … <br />… … <br />… … <br />… … <br />… QUALITY GRADES FOR CONTRACT: C8T79 GRADING TYPE: FINAL … <br />… NOTE: Any criteria not scored are not included in the overall grade. … <br />… … <br />… WORK TYPE: 10.1 FIRM GRADED: EISMAN & RUSSO, INC. DATE: 06OC … <br />… … <br />… TEST SCORE … <br />… … <br />… CCEI CONTRACT MANAGEMENT: … <br />… 1. Continuously provided CTQP qualified experienced staff as … <br />… proposed; was responsive to Department's staffing requests; … <br />… if personnel changes occurred, reasonable efforts were made … <br />… so that the credentials of replacement staff were equal to or … <br />… exceeded the qualifications of the person(s) originally approved. 4 … <br />Ä¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢Ô <br />Å Function keys:¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢Õ <br />… PF1-Help PF3-End PF5-RFind PF6-Bottom PF7-Page Up … <br />… PF8-Page Down PF9-Top PF10-Left PF11-Right PF12-Cmd Line … <br />Ä¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢Ô <br />ÅFSLIST: CN412JL.SASOP¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢Õ <br />… Command ===> … <br />… … <br />… 2. Coordinated with department personnel to ensure effective … <br />… contract management, with required submittals made timely, in the … <br />… subscribed format, with no material errors. Userids requested … <br />… promptly and access maintained; timesheets signed weekly, if … <br />… required; properly documented invoices submitted monthly; sub- … <br />… consultants paid promptly; contract funds were tracked & reported … <br />… as requested to avoid rush amendments; out-of-fund conditions, or … <br />… settlement agreements. 4 … <br />… 3. Communicated regularly with Department CPM or project … <br />… administrator and performed QC/QA inspection of staff on longer … <br />… assignments to ensure the Department needs were being met. 4 … <br />… 4. Utilized CEI personal protective equipment at all times as … <br />… required. 4 … <br />… 5. Compliance with agreed upon DBE/MBE utilization goals and … <br />… procedures. … <br />… For Task Driven Contracts(Districtwide, On-call, GEC type): … <br />Ä¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢Ô <br />Å Function keys:¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢Õ <br />… PF1-Help PF3-End PF5-RFind PF6-Bottom PF7-Page Up … <br />… PF8-Page Down PF9-Top PF10-Left PF11-Right PF12-Cmd Line … <br />Ä¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢Ô <br />ÅFSLIST: CN412JL.SASOP¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢Õ <br />… Command ===> … <br />… … <br />… 6. Responded by the Department deadline whether a task request … <br />… was accepted. If accepted, promptly developed an understanding … <br />… of the assignment; prepared and submitted an accurate request … <br />… package, and dispatched approved, properly equipped personnel … <br />… when needed, but not prior to receiving authorization. … <br />… CCEI MGT. GRADE: 0.36 … <br />… … <br />… … <br />… ISSUE IDENTIFICATION AND RESOLUTION: … <br />… 1. Acted proactively when identifying issues by working with … <br />Page 1